
TWO PEOPLE NEEDED:
Moving the Forge/Station requires two people. The
Forge/Station is very heavy and it is important to have another person present to
help prevent collisions and injury.
Use the included Forge/Station base specifications sheet to find the points where you will need to drill.
Use a marker or sharp concrete punch to mark the concrete in these locations.
4
Using an 11/16" masonry bit on your hammer drill, drill each of the four holes to be approximately 4"
deep.
5
Vacuum or blow any dust out of the mounting hole.
6
Move the Station back into alignment with the mounting holes. It is helpful to place the threaded mounting
rod through the hole to determine if the stand has been properly oriented over the holes.
7
Next, lower the leveling feet again by following these steps again.
Turn the handles on your leveling feet clockwise to lower the feet. Once it contacts the floor and
you feel resistance continue turning it for about ¾ of a full rotation.
1
8
64
© 2020 COPYRIGHT READY Robotics ALL RIGHTS RESERVED