background image

Raytec Americas: 

+1 613 270 9990 • [email protected]

Raytec Ltd reserve the right to change specifications without prior notification or public announcement.

Version 1

www.raytecled.com

1277-D

-0008

Installation Steps

Wall Mount Installation

Step 1.

Step 2.

Step 5.

Step 6.

Step 7.

Step 3.

Step 4.

This XR-WM kit is intended for use with UL Listed XR luminaire as marked on the luminaire nameplate.
Accessory Package Contents

Refer to alternate instructions if using Conduit, Hook, Pole or Yoke Mount

Inspect shipping package and contents to ensure no damage has occurred during 
shipping.  

Install provided 3/4 NPT conduit plugs in desired locations on wall mount.  To maintain 
ingress rating all NPT entries not used for wiring connections are required to be 
plugged. Torque to 10 Nm (88 in-lbs)
NOTE: To aid in assembly and protection against ingress use of a petrolatum or soap 

thickened mineral oil based thread lubricant/sealant is necessary.
Un-used conduit opening must be plugged to maintain the integrity of the enclosure.

Install Back Cover Plate with 4x M4 Flat head screws and adhesive backed gasket. 
Apply gasket with adhesive side applied to mount main body.  Torque to 1.7 N-m (15 
in-lbs).

Mount luminaire assembly to desired location using 4x 1/4-20 OR M6 Screws or Bolts 
(Not Provided).

Resume installation instructions provided with luminaire. (STEP 4 in XR Installation 
Instructions from the Surface/Ceiling Mount installation provided with Luminaire).

Install provided 3/4” NPT plastic bushing onto side NPT entry on XR head, rotate 
so that flats are parallel to lens surface to avoid interference with mount hardware.

Install Wall Mount main body with included M6 bolts and washers and adhesive backed 
gasket. Apply gasket to mount with adhesive backed side. Torque to 5 Nm (45 in-lbs).

SPX-BKT-XR-WM

QTY

PART NAME

1

WALL MOUNT

1

WALL MOUNT PLATE

1

WALL MOUNT PLATE SIDE GASKET

1

WALL MOUNT GASKET

4

6 x 25mm SOCKET HEAD CAP SCREW

4

M4x 10mm FLAT HEAD SOCKET CAP SCREW

4

M6 FLAT WASHER

3

3/4 NPT HEX CAP PLUG

1

3/4 NPT THREADED SMOOTH BORE BUSHING

Steps 2 through 5

Step 6

[5.7in]

145mm 

4 x   6.8mm THRU ALL

[5.7in]

145mm 

SPZ-XR

!

Warning

Attention:

Le luminaire XR ne doit pas être orienté vers le haut à un degré 
quelconque audelà de la position horizontale pour les installations 
en zones dangereuses de classe II, division 2, zone 22 et classe III.

Warning:

The XR head must not face upwards any degree beyond the 
horizontal position for Class II, Division 2, Zone 22 and Class III 
hazardous location installations.

LIGHT

BEAM

HORIZON

Summary of Contents for XR8

Page 1: ...Wiring only Dimming control wires must be rated 300V minimum for luminaires with suffix AC 600V minimum for luminaires with suffix HV Certified to Connections Housing Ingress Protection Ambient Temper...

Page 2: ...racket is keyed to allow partial pre installation of two fasteners for ease of install B For ceiling mounting configurations connect 4x anchors to the 12 7mm 0 5 holes Suspension hardware Not provided...

Page 3: ...a of installation Connect Violet and Gray driver lead wires to 0 10VDC control wiring LED Drivers will source a combined maximum of 200 A for control needs 0 10V Controller must sink current from LED...

Page 4: ...ns without prior notification or public announcement Version 1 www raytecled com 1277 D 0008 PS 1 GROUND Factory BLACK WHITE GREEN VIOLET GREY Wiring Diagram Black Line White Neutral Green Ground Purp...

Page 5: ...n provided with Luminaire Install Pole Mount and gasket with adhesive side applied to mount using included M6 bolts and washers Torque to 5 Nm 45 in lbs Thread luminaire assembly onto 1 5 NPT pole NOT...

Page 6: ...dy Torque to 1 7 N m 15 in lbs Mount luminaire assembly to desired location using 4x 1 4 20 OR M6 Screws or Bolts Not Provided Resume installation instructions provided with luminaire STEP 4 in XR Ins...

Page 7: ...tructions provided with luminaire STEP 4 in XR Installation Instructions from the Surface Ceiling Mount installation provided with Luminaire Make wiring connections from branch circuit conductors to f...

Page 8: ...e Mount luminaire assembly to desired location using 4x 1 4 20 OR M6 Screws or Bolts Not Provided Adjust and aim luminaire to desired position Torque hardware nuts to 9 N m 80 in lbs Resume installati...

Page 9: ...for a minimum of 110lbs Secondary safety cables made from stainless steel aircraft cable are available upon request Slide anti rotation lock onto suspension hook assembly and install hook assembly in...

Page 10: ...ll luminaire onto NPT threaded nipple Tighten to hand tight contact plus 1 to 2 turns When using the R CC losen set screw and slide R CC into place with flats aligned to those on luminaire hub and tig...

Page 11: ...s to hang via retention strap NOTE Screws are captive fasteners and will remain attached to the Lens for ease of reinstall and prevent loss of fasteners Close XR Wiring Cover Ensure the retention cabl...

Page 12: ...XR SP AC Black Line White Line 2 Green Ground Purple DIM Grey DIM 1 Connect Black lead from surge protector to splice or terminal connected to Input branch circuit conductor and black line lead from...

Page 13: ...p NOTE Screws are captive fasteners and will remain attached to the Lens for ease of reinstall and prevent loss of fasteners Close XR Wiring Cover Ensure the retention cable is not pinched between XR...

Page 14: ...XR SP HV Black Line White Line 2 Green Ground Purple DIM Grey DIM 1 Connect Black lead from surge protector to splice or terminal connected to Input branch circuit conductor and black line lead from...

Reviews: