
UK/Europe Tel: +44 (0) 1670 520055
Americas Tel: +1 613 270 9990
Toll Free: +1 888 505 8335
18
Optional PSU Installation
18.1 PSU Mounting
Ensure the power supply is mounted securely to a flat external surface in a well ventilated area
Ensure the power supply enclosure is fully sealed and water tight before operation
18.2
Wiring Interfaces
Isolate the primary supply at all times whilst the lid is removed from the PSU.
Mains Supply
100-240VAC
16mm Gland
Cable OD 4-8mm
Multiplexed Cat5e
16mm Gland
Cable OD -4mm
Power/Aux Cable
16mm Gland
Cable OD 4-8mm
Cat5e Camera Cable
12mm Glands
Cable OD 3-6.5mm
24 VDC Power
PC Aux
Tel Aux
Cat5e Termination
IDC Punch Down
Suitable Tool :-Knipex
97-40-10
Mount PSU with glands
pointing down and lid fitted
as shown