14
Minimum Clearances to Combustibles
Top=0
Front =0 AL, CL
Rear=0
Left=0
Right=0
AL = Alcove
CL = Closet
Note:
The XPak boiler has passed the zero inches vent clearance to combustibles testing requirements provided by the boiler Harmonized
Standard ANSI Z21.13b 2007 – CSA 4.9b 2007 and therefore is listed for zero clearance to combustibles when vented with a single
wall special venting system (AL29-4C material) or UL/ULC-listed gas vent material. The zero inches vent clearance to combustibles
for the XPak boiler supercedes the clearance to combustibles listing that appears on the special venting system label.
DIMENSIONS AND CONNECTIONS (Fig. 4)
Recommended minimum service clearances
1” (25 mm)
1” (25 mm)
XPak 85= 3-15/16“ (97 mm)
XPak 120= 4-1/2“ (114 mm)
=
=
30-3/4” (781 mm)
XPak 85 = 15-3/4” (400 mm)
XPak 120 = 17-3/4” (451 mm)
Fig. 4
50 mm
50 mm
150 mm
from cas
ing or
25 mm abo
ve
flu
e elbow
(whiche
ve
r i
s ap
plicable)
150 mm
1” (25 mm)
6” (150 mm)
12” (300mm)
1” (25 mm)
30-3/4” (781 mm)
14-1/8” (359 mm)
water 4-7/8” (124 mm)
5-1/2”
(140 mm)
8-5/8”
(219 mm)
gas 6-13/16” (173 mm)
Summary of Contents for XPAK 120
Page 1: ......
Page 20: ...20 Fig 10 Fig 9...
Page 21: ...21 Fig 11 Fig 12...
Page 38: ...38 WIRING FUNCTIONAL DIAGRAM Fig 40...
Page 59: ...59 14 EXPLODED DIAGRAMS Drawing 1 5 7 9 3 12a 4 6 8 12a 1 10 2 11...
Page 60: ...60 Drawing 2 17 18 56a 56a 14 15 56b 13 16 12b 19...