23
BOILER TEMPLATE (Fig. 15)
Wall Mounting Information
XPak comes with a template,
which allows you to easily mark
the location of the screws for the
mounting bracket and the location
of the flue gas pipe on the wall
(Raypak coaxial PP vent system
only).
The connection to the gas circuits
must be made on site, 3/4” gas
cock is supplied with the boiler.
Fig. 15
5.90"
3.35"
1.38"
XPak 120 - 17.81"
XPak 85 - 15.75"
14.17"
16.25"
C/C
16"
1 . 5 "
3.54"
inside 3"
inside 3.15"
4,53" Hole for 60/100mm coaxial vent
30.71" Boiler height
3.14"
XPak
120
XPak
85
XPak
85
XPak
120
Ø1/4" holes for earthquake restraint (2 places)
IN
3/4"
NPT male
OUT
3/4"
NPT male
Gas shut off valve (supplied)
3/4" NPT female
Condensate piping flexible (supplied)
4/5" female
Boiler outline
Boiler bracket
(supplied)
Ø1/4" holes
for 5/16" lag
screws (4 places)
XPak
120
XPak
85
Inlet air either right or left
3" vent adaptor (supplied)
3" inlet air adapter (not supplied)
Exhaust vent adapter (supplied)
Screw (2x) (supplied)
Screw (2x) (supplied)
Screw (2x) (fitted)
Inlet air adapter (supplied)
Wall stud
CENTER LINE
OF BOILER
L
C
Ensure there is adequate clearances for mounting the boiler (details given in
installation instructions).
The wall mount bracket is designed for a stud spacing of 16 inches from
center. For other stud spacing a solid mounting surface must be provided by
the installer.
Do not mount the boiler to a hollow wall. Be sure to mount the boiler to the
studs only.
Mount the wall bracket using 4 5/16" lag screws. Ensure the bracket is level
when mounted.
Extreme care is needed to ensure the bolts are secured in the studs.
Hang the boiler on the bracket and secure the bottom of the boiler with two (2)
additional lag screws.
This boiler is heavy and awkward to lift. It is
recommended and safer to install the boiler with two
people. Use caution as to not drop this boiler which
could cause personal injury. Verify that the boiler is
securely mounted before leaving the boiler unsupervised.
WARNING
Pressure relief valve drain
3/4" NPT female
0.825” female
Summary of Contents for XPAK 120
Page 1: ......
Page 20: ...20 Fig 10 Fig 9...
Page 21: ...21 Fig 11 Fig 12...
Page 38: ...38 WIRING FUNCTIONAL DIAGRAM Fig 40...
Page 59: ...59 14 EXPLODED DIAGRAMS Drawing 1 5 7 9 3 12a 4 6 8 12a 1 10 2 11...
Page 60: ...60 Drawing 2 17 18 56a 56a 14 15 56b 13 16 12b 19...