Inspect at regular intervals the following:
• All cables (make sure they are no cuts or damages) as well as connectors (make
sure they are no corroded contacts).
• The plunger of the ATB switch for excessive corrosion.
• If the lockout relay works well.
6.2 Periodical inspections (every 6 months)
-6-
inspection & maintenance
• When you power on the system, check if all visual and audible alarms are on,
and if the lockout is activated.
• Make sure that the system has been properly configured.
• Verify the accuracy of the clock.
• Verify that no error has been detected by the system.
• Verify the weight of the hook block (must be consistent with the last time you
checked).
• Verify the radius according to the boom selection. The displayed radius must be
between 0 and 10% greater than the actual radius or it must be in accordance
with current regulation.
• Verify that the capacity displayed conforms to the capacity chart of the crane
manufacturer.
• Make sure the A2B functions well.
6.1 Frequent Inspections
(At the beginning of each shift during which the crane is used)
Warning! Any deficiencies shall be examined and
a decision must be taken as to whether they can
constitute a hazard before using the machine.
Summary of Contents for i4500
Page 2: ...This page has been intentionally left blank ...
Page 3: ...This page has been intentionally left blank ...
Page 4: ...This page has been intentionally left blank ...
Page 6: ...This page has been intentionally left blank ...
Page 11: ...This page has been intentionally left blank ...
Page 12: ...This page has been intentionally left blank ...
Page 30: ......
Page 71: ...This page has been intentionally left blank ...
Page 89: ...89 i4500 Lattice Boom Crane Instruction Manual 55M4500EBE00A A Notes ...