ray 200i Installation And Operation Instructions Manual Download Page 9

9

P/N 42-9470 11/07 Copyright 2007 Mestek, Inc.

Cast iron condensing boiler

 

Cast iron condensing boiler

 — Installation and operation manual

Figure 3 

Air opening options for combustion air 
drawn from boiler room

Installation site preparation 

(continued)

Combustion air requirements

Air ducted to boiler air intake

If air is ducted from outside to the boiler air intake, follow instructions in the 

200i

 Vent/Air manual to size and install the air piping.

If the boiler is located in a small room (clearances less than the recommended 
SERVICE/OPERA

  TION clearances given in Figure 2, page 7):

No other appliances in the room — Provide two ventilation openings 
through one of the enclosure walls. Each opening must be sized for a free 
area of at least 1 square inch per 1,000 BTUH input of the 

200i

 boilers in 

the room. One opening must be within 12 inches of the ceiling, the other 
within 12 inches of the fl oor.
Other appliances in the same room — Th e room must have combustion 
air openings sized for the other appliances. Increase the free area of the air 
openings by one square inch per 1,000 BTUH of the 

200i

 boilers located 

in the room.

Air from boiler room

When the boiler draws combustion air from the boiler room:

If the room volume is at least 50 cubic feet per BTUH of the combined 
input of all appliances in the room, no special openings are needed 
UNLESS the building is of tight construction (see defi nition). If the building is 
of 

tight construction

, provide openings to the 

building

 in accordance 

with all applicable codes.
If the boiler is in a space smaller than 50 cubic feet volume per BTUH input, 
provide air openings using one of the methods in Figure 3.

Defi nitions

Free area

 — Louvers or grilles reduce the area of an opening. Free area is the 

area remaining with the louver or grille in place. If the free area of a louver is 
unknown, use the following:

Metal louver — Multiply required free area of the opening times 1.7 to 
determine actual area of the required opening.
Wood louver — Multiply required free area of the opening times 5 to de-
termine actual area of the required opening.

Tight construction

 — When a building is extensively sealed to prevent air 

infi ltration, it cannot provide enough air for combustion unless openings are 
provided to the outside. Th e National Fuel Gas Code defi nes such buildings as 
having all of the following:

Walls and ceilings exposed to the outside atmosphere have a continuous 
water vapor retarder with a rating of 1 perm or less with openings gasketed.
Weather-stripping has been added on openable windows and doors.
Caulking or sealants are applied to areas such as joints around windows 
and door frames, between sole plates and fl oors, between wall-ceiling 
joints, between wall panels, at penetrations for plumbing, electrical, and 
gas lines, and in other openings.

Conversion factors

In

2

/1,000 BTUH

 to 

cm

2

/kw

 — Multiply 

In

2

/1,000 BTUH

 times 

22

In

2

/2,000 BTUH

 to 

cm

2

/kw 

— Multiply 

In

2

/2,000 BTUH

 times 

11

In

2

/3,000 BTUH

 to 

cm

2

/kw 

— Multiply 

In

2

/3,000 BTUH

 times 

7.4

In

2

/4,000 BTUH

 to 

cm

2

/kw

 — Multiply 

In

2

/4,000 BTUH

 times 

5.5


Upper openings (

U

) must be within 12 inches of the ceiling. Lower 

openings (

L

) must be within 12 inches of the fl oor.

Option 1 —

 

air openings through interior wall

When air is supplied to the boiler room through openings in an interior 
wall (air supply from inside the building), size each opening to provide 
minimum free area of:

1 in

2

 per 1,000 BTUH

 of all 

200i

 boilers in the room.

Option 2 —

 

air openings through outside wall

When air is supplied to the boiler room through openings in an outside 
wall (air supply from outside the building), size each opening to provide 
minimum free area of:

1 in

2

 per 4,000 BTUH

 of all 

200i

 boilers in the room.

Option 3 —

 

horizontal ducts to outside wall

When air is supplied to the boiler room through horizontal ducts to an 
outside wall (air supply from outside the building), size each opening 
to provide minimum free area of:

1 in

2

 per 3,000 BTUH

 of all 

200i

 boilers in the room.

Option 4 —

 

openings to attic/crawl space

Air openings can be connected to a ventilated att ic or crawl space. Th e 
upper opening must be to the att ic. Th e lower opening can be a vertical 
duct from the att ic or an opening in the fl oor from the crawl space. Size 
each opening to provide minimum free area of:

1 in

2

 per 3,000 BTUH

 of all 

200i

 boilers in the room.

Option 5 —

 

single opening (not shown)

A single opening directly connected to the outdoors through a wall or 
a vertical or horizontal duct can be used if the installation provides the 
clearances of Figure 2, and the top of the opening is within 12 inches of 
the ceiling. Size the opening to provide minimum free area of:

1 in

2

 per 3,000 BTUH

 of all 

200i

 boilers in the room.

 

If other appliances are located in the same room 

as the boiler, increase the size of air openings 

to provide the free area required for the other 

appliances in addition to the air required for the 

200i

 boiler(s).

3

Summary of Contents for 200i

Page 1: ...ated with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with contaminated air follow the instruction manual guideline...

Page 2: ...ication sensing Because of its low excess air operation and controlled combustion the burner also provides low NOX emissions and quiet operation Gas valve blower and venturi Most gas valves regulate a...

Page 3: ...mbly Pressure switches blocked flue and blocked air inlet Control connection board Electrical box power and control entrances Water return connection Air inlet sleeve Relief valve Relief valve piping...

Page 4: ...ore leaving the installation site after start or service fill out the Start up service history information on the back page Contents Customer service and technical support Please direct all questions...

Page 5: ...s Should overheating occur Do not shut off power to the circulators if the boiler should overheat or thegassupplyfailtoshutoff Instead shutoffgassupplytotheboilerwith a manual valve in the gas supply...

Page 6: ...ctrical requirements Voltage 120 vac 60 hz 1 phase Current draw 120 volt power line Amperes 2 75 Thermostat anticipator setting Amperes 0 5 Operating control Mestek SmartCycleTM control 4 Control oper...

Page 7: ...duct or other means of providing make up air if the intake air op tion isn t used Any building utilizing other gas burning ap pliances a fireplace wood stove or any type of exhaust fan must be checke...

Page 8: ...ftheboilerroom provides at least the minimum SERVICE OPERATION clearances given in Table 2 Failure to provide adequate ventilation could result in overheating of the boiler components or the room pote...

Page 9: ...dings as having all of the following Walls and ceilings exposed to the outside atmosphere have a continuous watervaporretarderwitharatingof1permorlesswithopeningsgasketed Weather stripping has been ad...

Page 10: ...losion causing possible severe personal injury death or substantial property damage Connecting the relief valve Connect inch NPT black iron pipe and fitting so the relief valve as shown in Figure 4 Fo...

Page 11: ...a section of the piping that will ensure enough flow to operate the switch Additional high limit controls For ASME CSD 1 or Canadian applications or when required by applicable codes install an additi...

Page 12: ...those that have air above the water in direct contact with the water See Figure 5 right side See Figure 7 for suggested piping Guidelines for closed type expansion tanks NEVER use automatic air vents...

Page 13: ...d 12 Extra high limit when required 13 Zone valve 14 Zone circulator 15 Differential pressure by pass valve Use when high head circulator may cause noise erosion or valve lifting problems when only a...

Page 14: ...tion of DHW tanks Makesuretoincorporateflow checkvalvesasshown Thesepreventforced flow in idle zones LEGEND 1 200i boiler 2 Boiler circulator 4 Boiler system circulator 5 Indirect fired DHW tank when...

Page 15: ...through the heating loop s This is important for summer time operation of DHW tanks Makesuretoincorporateflow checkvalvesasshown Thesepreventforced flow in idle zones LEGEND 1 200i boiler 2 Boiler ci...

Page 16: ...ation when required When heating system boilers are piped in parallel as in Figure 12 connect the DHW tank as a zone off of the main header or install boilers dedicated to the DHW application LEGEND 1...

Page 17: ...es If using variable speed control of the system circulator ensure that the flow never drops below the total minimum for all boil ers connected The boiler loop can be any of the designs in this manual...

Page 18: ...ock pressure test port Check the gas type The 200i comes from the factory ready to be piped to the gas supply If for any reason the boiler is not for the type of gas avail able at the installation sit...

Page 19: ...ipe sizing Required supply pressure at boiler Minimumgassupplypressure naturalgasorpropane bothfor flowing and static conditions 4 inches 102 mm water column Maximum gas supply pressure natural gas or...

Page 20: ...substantial property damage The electrical connections to this boiler must be made in accordance with all applicable local codes and the latest revision of the National Electrical Code ANSI NFPA 70 In...

Page 21: ...ith the boiler cannot be used for system circulation Itmustbeused assuppliedfromthefactory Itcirculateswateraftertheboiler stops firing to prevent potential damage from heat pocketing in the top of th...

Page 22: ...using 4 wire zone valves without a zone controller For other applications such as circulator relays or zone controllers see Appendix A in this manual Also see the Control manual Polarity The connectio...

Page 23: ...c Cast iron condensing boiler Cast iron condensing boiler Installation and operation manual Figure 21a 200i wiring summary see Boiler manual and Control manual text for additional information Wiring a...

Page 24: ...boiler Cast iron condensing boiler Installation and operation manual Figure 21b 200i wiring summary see Figure 21 for locations see Boiler manual and Control manual text for additional information Wir...

Page 25: ...ff switch ON The control will beep at least twice and the display will show the first STANDBY display in Figure 22 Note that pushing the DOWN button on the keypad will change the right side of the dis...

Page 26: ...xample The setpoint must never be higher than the OP LIMIT setting minus the LIMIT BAND minus half of the HEAT BAND setting This would cause the boiler to hit limit while trying to modulate Example If...

Page 27: ...e arrow keys until the cursor points at OA RESET The default setting is ON To change the setting press SELECT and use the arrow keys to change from ON to OFF Press SELECT then BACK If outdoor reset is...

Page 28: ...ndanyothergas burningappliance to their previous condition of use Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code A...

Page 29: ...l a cover over the tubing or some other means to protect it from damage or movement Prevent freezing Do not route the line through or termi nate the line in any area that could expose the condensate t...

Page 30: ...atter Use cleaning chemicals sold for use in hydronic systems Replacementboilerinstallationsoftenhavelargeamountsofaccumulatedsediment and corrosion that must be removed to ensure boiler life and reli...

Page 31: ...tem water temperature reaches the maximum op erating temperature that the system and boiler temperature controls will allow The pressure in the boiler must never be below 12 psig Lower pressure could...

Page 32: ...smell Before start up and periodi cally afterwards have the propane supplier check verify the odorant level Never attempt to measure gas valve outlet pressure Donotattempttomeasuretheboilergasvalveou...

Page 33: ...sig 3 5 kPa Manual gas valve Open the main manual gas valve and check the gas piping and joints in the boiler Check for leaks if not already done following the instructions on page 18 Starting the boi...

Page 34: ...ow the bottom of the heat band 10 seconds PRE PURGE Ignition trial ON at ignition RPM 30 of maximum 4 seconds ON ON IGN 30 Flame is sensed Stabilization period ON at ignition RPM 30 of maximum 6 secon...

Page 35: ...4 5 Wait five minutes to clear out any gas Then smell for gas including near the floor If you smell gas Follow B in the safety information above If you don t smell gas go to the next step 6 Turn manu...

Page 36: ...36 P N 42 9470 11 07 Copyright 2007 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Installation and operation manual Illustration 26 En francaise Starting the boiler continued 12...

Page 37: ...p covering the flue gas sam pling hole Figure 27 The flue gas vent pipe may be hot Touching the pipe with unprotected skin could result in a severe burns 2 Slide the hose clamp off of the sample openi...

Page 38: ...he gas pressure at the manual gas valve Gas pressure should never fall off by more than 2 inches w c 50 mm To meter gas input natural gas only Meter gas input with the high fire jumper in place Turn o...

Page 39: ...erlysupported Remove the seven Phillips head screws securing the jacket top to the jacket sides Lift off the jacket top Leave the wire harnesses connected Move the insulation aside if necessary Adjust...

Page 40: ...ration with prepurge then continue through a normal start cycle With the manual gas valve closed the boiler should attempt ignition three times then lockout as described below Ignition failure Make su...

Page 41: ...er is damaged or blocked with debris consult the factory for corrective action Operating the boiler with a damaged or 13 obstructed heat exchanger could result in severe personal injury death or subst...

Page 42: ...afterwardstopre vent contamination of other clothing NIOSH First aid procedures Eye exposure irrigate immediately Breathing fresh air Read before proceeding Failure to adhere to the following could re...

Page 43: ...r 10 Replace the three thumbscrews and finger tighten securely 11 Turn the boiler on off switch ON Accessing the electrode assembly Turn the boiler on off switch OFF If the boiler ignition electrodes...

Page 44: ...of the assembly and a lock washer on top 8 Disconnect the three wire harnesses at the gas valve and blower items 2 and 3 Figure 36 In this illustration the wires are not shown 9 Lifttheuppercoverplate...

Page 45: ...45 P N 42 9470 11 07 Copyright 2007 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Installation and operation manual Maintenance continued 14 Notes...

Page 46: ...ABS UPPER COVER 1 24 59 1091 FILTER BOX ADAPTER GASKET 1 25 70 1237 FILTER BOX ADAPTER 1 26 57 2913 1 4 20 X 1 NYLOK SC HD CAP SCREW 4 27 54 3234 1 2 FLEX GAS LINE 1 ITEM PARTNo DESCRIPTION QTY 28 70...

Page 47: ...47 P N 42 9470 11 07 Copyright 2007 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Installation and operation manual Replacement parts continued 15...

Page 48: ...Connectingthewiresincorrectlycancausethe transformer to be shorted out and damaged 3 wirezonevalves Youwillhavetorewireexisting3 wirezonevalves tomeettherequirementsshowninFigure A1 Movethethermostat...

Page 49: ...replace with a circulator zoning controller or install relays that provide a 24VAC common terminal Heat Demand terminal connections using circulator relays The end switch leadsfromtherelaysmustconnect...

Page 50: ...s shown in Figure A3 The connections to the IAR negative terminals IAR must be from the zone controller s 24VAC common terminal as shown Connecting the wires incorrectly can cause the transformer to b...

Page 51: ...densing boiler Installation and operation manual Figure A3 Indoor Air Reset wiring to IAR terminals Heat Demand and DHW Demand using typical zone controller for either circulators or zone valves see F...

Page 52: ...alled correctly Air purged from water system Boiler operated through several cycles Air vents checked and opened as needed Limits and interlocks tested Water piping correct and operational Metered gas...

Reviews: