2. Installation basic components
It’s advised to install the Side-Shift or drawbar
steering in the order as listed below:
1. Installing the Side-Shift cylinder (if
necessary).
2. Checking the hydraulic manifold.
3. Mounting of the manifold and connecting
the hydraulic hoses.
4. Mounting the Steering Controller.
5. Mounting the angel sensor.
6. Mounting the GPS-antenna.
7. Mounting the DynamIQ.
8. Placing and connecting cabling
2.1. Installing the Side-Shift cylinder
Start with mounting the hydraulic cylinder. The
cylinder is available in three weight categories
2; 4,5 and 8 ton. It’s possible to either mount
directly to the implement or to use the adapter
frame. In the adapter frame it’s possible to
mount different types of mounted implements.
When mounting the cylinder directly to the
existing implement it’s important to place the
cylinder the same way as the original linkage
points, this prevents the machine from getting
further behind the tractor.
Make sure that at the limits of the linkage
(up and down) and at the limits of the
Side Shift cylinder (left and right), the
PTO shaft can move free without hitting
the frame.
Make sure the Side-Shift cylinder is in its
center position before lifting the
implement.