2 1
Loading an A-B Line
If you have a saved A-B line, you can open it for use at a later time. To load
a saved A-B line:
1.
After you have either started a new straight job, reset an A-B line, or
loaded a previous job, touch the ‘
Menu button
’.
2.
Touch the ‘
A-B Functions
’ button.
3.
Touch ‘
Load A-B Line
’.
4.
The ‘Load A-B Line’ screen displays. Select a
saved A-B
line from the
list and touch
OK
.
5.
The A-B Line is now loaded for the current job.