![Rauch TWS 85.1 Instruction Manual Download Page 80](http://html1.mh-extra.com/html/rauch/tws-85-1/tws-85-1_instruction-manual_3833523080.webp)
General maintenance and service
9
74
9.2
Maintenance plan
This maintenance plan applies to vehicles with normal load. In case of an ex-
tremely high load reduce the maintenance intervals accordingly. This prevents
damage to the tractor, the load transfer vehicle or the fertiliser spreader.
9.2.1
General maintenance plan
9.2.2
Maintenance plan for axles and braking system
NOTICE
For further information, please refer to the operator’s manual of the tractor and
the fertiliser spreader.
Component parts
Maintenance tasks
Maintenance plan
Comment
Wear parts and screw con-
nections
Inspect regularly
Cleaning
To be carried out after each de-
ployment
Towing eye/ball coupling
Check for wear
Lubrication plan
Component parts
Maintenance tasks
Maintenance plan
Comment
Brakes
Check function before driving
Check condition and function once
a year
By specialist work-
shop
Brake pads
every 1000 operating hours, at
least quarterly: check for wear In-
stall new brake pads, if required
Air reservoir of braking
system
Drain daily
Wheels
Retighten the wheel nuts after the
first 50 km
After the first 50 operating hours
and every 100 hours: Check the
bearing clearance of the wheel
hubs
Check the inflation pressure regu-
larly
Summary of Contents for TWS 85.1
Page 30: ...Safety 3 24...
Page 38: ...Transportation without tractor 5 32...
Page 76: ...Instructions for load transfer 7 70...
Page 78: ...Faults and possible causes 8 72...
Page 104: ......