![background image](http://html1.mh-extra.com/html/rands/zna67ext/zna67ext_getting-started_3278494040.webp)
Basic operation
R&S
®
ZNA67EXT
40
Getting Started 1179.6295.02 ─ 02
9
Basic operation
This chapter describes how to configure the standard setup with two external test
sets, for 2-port transmission measurements.
On delivery, the R&S
ZNA67EXT is already preconfigured for the number of
external tests sets included in the ordered VNA system variant. A preset
does not affect the converter configuration.
After a factory reset, however, the R&S
ZNA67 comes up with its regular
VNA setup, without frequency converter configuration.
To put the VNA system into operation, follow the steps described in
"Putting the system into operation"
Configuration and measurement steps
Configuring the measurement setup and measuring the DUT involves the follow-
ing steps:
1. Configuring the converters in the R&S
ZNA firmware
Chapter 9.2, "Converter configuration"
2. Establishing the required connections between the R&S
ZNA and the test sets
Chapter 8, "Connecting the external test sets"
3. Power calibration (optional for S parameter measurements
Chapter 9.4, "Scalar power calibration and leveling (optional)"
4. System error correction, using a suitable calibration kit
Chapter 9.5, "System error correction"
5. Connecting the DUT
6. Measuring the DUT