45
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
15-09-2020
A3
8288604
21-09-2023
1
2
1
2
3
4
6
5
6
3
4
2
4
1
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
15-09-2020
A3
8288604
21-09-2023
1
2
1
2
3
4
6
5
6
3
4
2
4
1
US
AIR KIT - FRESH AIR SUPPLY, AIR THROUGH THE BACK.
When the space heater is installed in a structure where direct combustion air is re-
quired, an air kit must be used to supply fresh air ot the appliance from outside.
1. Remove the knock-out form
in the air-box, plinth and the
back panel.
2. Mount the air nozzle (1) on the
air-box
3. Mount the air valve (3) on the
wall, over the hole leading to the
outside.
4. Mount the flex hose (2) to the air
nozzle (1) with the hose clamp (4)
5. Connect the flex tube (2) to the
air valve (3) using a hose clamp
(4).
AIR KIT - FRESH AIR SUPPLY, AIR THROUGH THE BOTTOM.
When the space heater is installed in a structure where direct combustion air is re-
quired, an air kit must be used to supply fresh air ot the appliance from outside.
1. Remove the knock-out form in the air-
box, and remove the cover plate (1)
2. Mount the air nozzle (2) on the air-box
3. Mount the air valve (4) over the hole in
the bottom plate with the gasket (3)
4. Mount the flex hose (5) to the air noz
zle (2) with the hose clamp (6)
5. Connect the flex tube (5) to the air
valve (4) using a hose clamp (6.