
Creating Irrigation Schedules,
continued
47
Scheduling to Run on Specific
Days and Dates
You can program your controller to irrigate on
a selected day(s) and date(s) in a 14-day period,
instead of on the 14-day cycle (which begins on the
day you initially program the controller). You can
also set the first date you want to begin irrigating.
1. From the
Main Operating Screen
, scroll to the
Program
you want.
2. Select
Sched.
then
Next
to reach the
Run
every
and
First
labels.
Note: Run every
refers to which days you want a
specific
Program
to run (
Run every 1st day; Run
every 2nd day
; etc).
First
(which shows the year,
month and day) refers to the date you want the
sequence to begin.
3. To change the
Run
every
day, press the button
pointing to the
Every
label. Each time you press
the button, the day increases by one, up to
Run
every
14th day
(in the 14-day
Schedule
).
Note:
You can see the 14-day
Schedule
change
each time you press the button.
Note:
An
arrow
label next to
Every
shows the
direction you are scrolling. Pressing the button
pointing to the
arrow
label changes the direction
you are scrolling.
4. To change the date you want to start the
sequence, press the button pointing to the
First
label. Continue to press the button to reach
the start date you want.
Note:
An
arrow
label next to
Every
shows the
direction you are scrolling. Pressing the button
pointing to the
arrow
label changes the direction
you are scrolling.
Repeating and Pausing Programs
Once you set-up a
Program
, you can repeat it up to
99 times and set timed pauses (in minutes) between
each repeated
Program
.
1. From the
Main Operating Screen
, scroll to the
Program
you want to repeat.
2. Select
Sched.
and
Next
to reach the
Repeat
label.
Program 5 Total 1 : 57
15 --W--S--T--F--M (1) 20 : 00 100% P
Run every 2. day Repeat 0 times
First 2002 - 02 - 12
14:02:30
Every
First
Repeat Pause
Next
Program 5 Total 1 : 57
15 --W--S--T--F--M (1) 20 : 00 100% P
Run every 3. day Repeat 2 times
First 2002 - 04 - 21 Pause: 5 Min.
14:02:30
Every
First
Repeat Pause
Next
Summary of Contents for MDC2
Page 1: ...MDC Controller Unit MDC2...
Page 10: ......
Page 82: ...This page intentionally left blank...
Page 98: ...This page intentionally left blank...
Page 114: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...