Programming and Operation,
continued
40
Line Survey
Line survey allows the user to perform an amperage
draw and display those values on the main screen.
1. From Main Menu screen, navigate to
4. Test
and
press
OK
.
You will be taken to the
Test Menu
.
2. Navigate to
4. Line Surv
and press
OK
.
3. Press
OK
when you are asked
Activate Line
Survey?
You will observe the
vL
and
vG
values on the
display.
Note:
VL indicates voltage on line and normally ranges
between 34 - 37 V. VG indicates voltage to ground
and should be slightly negative. I
1
and I
2
indicate
currents in each of the lines in the two-wire path and
should be nearly identical. If these measurements
deviate much from each other this could indicate that
one of the two wires has a ground leakage. There may
be slight variations between values indicated on the
Line Surv
screen and those that appear on the
Test
Menu
.
Viewing the Log Data
The
Log Data
shows you a complete list of the
controller’s activity. The memory holds a 1500 line
log
. Adding a new line after you reach the maximum
erases the first line in the
log
.
1. From the
Main Menu
, move the
indicating
arrow
to
5. Log Data
and select
OK
.
Note:
The display shows five lines at a time (a page).
The page number is on the top of the page.
2. Use the
up
and
down arrows
to scroll from page
to page.
3. Select
OK
or select
minus (-)
to return to the
Main Menu
.
7:
99. 09. 27 11: 03: 00 V2 Start 0
99. 09. 27 11: 04: 00 V2 Stop 0
99. 09. 27 11: 04: 00 StopAll Decoders
99. 09. 27 11: 04: 00 A3 Start 0
99. 09. 27 11: 08: 00 A3 Stop 0
OK
–
14:02:30
*** Test Menu ***
1. Test of Line Decoders
2. Test of Sensor Decoders
3. Short Finding
4. Line Surv
5. Return
*** Test Menu ***
1. Test of Line Decoders
2. Test of Sensor Decoders
3. Short Finding
4. Line Surv
5. Return
VL: 35.7V I1: 1mA
VG: -2.1V I2: 5mA
*** Test Menu ***
1. Test of Line Decoders
2. Test of Sensor Decoders
3. Short Finding
4. Line Surv
5. Return
*** Test Menu ***
1. Test of Line Decoders
2. Test of Sensor Decoders
3. Short Finding
4. Line Surv
5. Return
VL: 35.7V I1: 1mA
VG: -2.1V I2: 5mA
Summary of Contents for MDC2
Page 1: ...MDC Controller Unit MDC2...
Page 10: ......
Page 82: ...This page intentionally left blank...
Page 98: ...This page intentionally left blank...
Page 114: ...This page intentionally left blank...
Page 122: ...This page intentionally left blank...