mod. SA 25
© Raimondi S.p.a.
machines & tools for the tile & stone professional
Chapter 3
Handling, installation, adjustments
Page 18/44-3
3.4 Assembly of the machine
TO CARRY OUT THIS OPERATION, WEAR THE PROTECTIVE GLOVES AND ACCIDENT-PREVENTION
SHOES
Remove the machine from the pallet and make sure there are no broken or damaged parts.
Free the rear legs by completely unscrewing the leg fixing knobs
(A)
.
Go to the rear side of the machine and, by means of the handle
(B)
lift the machine so that its leg goes beyond the left
safety bar
(C)
, then close it again. Moreover, make sure that the automatic safety hook on the right side
(D)
is completely
inserted.
Slowly lower the machine until the leg is resting on the two safety bar
(C-D)
previously closed and firmly screw the leg fixing
knobs
(A)
.
Go to the front side of the machine and completely unscrew the leg fixing knobs
(E)
.
Grip the handle
(F)
and lift the machine until the two safety bars
(G)
can be inserted.
Lower the machine until the leg
touches the safety bars
(G)
.
Firmly screw the leg fixing knobs
(E)
.
A
C
CHECK THAT THE MOTOR AND TROLLEY GROUP ARE CORRECTLY FASTENED
D
F
G
E
B