68
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
STEP 5:
Start the dosing system so that the first pellet grains can fall into the combustion
cup.
(This procedure can only be performed if the automatic controls are in OFF mode
(picture 17 system status))
Procedure:
Press the
P3
key
, and then, by pressing
P4 or P6
keys
in the sub-menu, you
get to the LOAD function, confirm by pressing the
P3
key
, by pressing keys
P4 or P6
switch from OFF to ON, confirm with the
P3
key
. By confirming with the
key, the doser initiates until the first pellet grains don’t start falling into the combustion cup.
Subsequently, by pressing
P4 or P6
keys
you are taken from ON to OFF, confirm by
the
P3
key
. At that moment, the doser stops working. By pressing the
P1
key
exit
the sub-menu.
Picture 27. The representation of the display upon selecting the LOAD function
STEP 6:
Starting the boiler.
Procedures:
Press the P2 key
, hold it for 2-3 seconds until you hear the sound signal. Then, the
‘Ignition’ message appears on the display (
picture 16 – system status
). The boiler starts
working.
In situations when pellets meet standards and all other chimney and airflow conditions are
met, the combustion process starts in 5 to 10 minutes..
During the first ignition, somewhat excessive smoke and sharp smells are to be expected until
factory anti-corrosion coatings aren’t completely dry, more precisely combusted.
The identical procedure is used to shut down the boiler, that is by pressing the
P2
key
until the sound signal we are entering the shutdown phase.
The room thermostat can be connected to automatic controls. In this case, it is
important to set the room temperature which is the main parameter for the boiler to
operate and for water in the boiler (70˚C). When the room thermostat is activated, the