2
R1K 24 /B - RAD - ING - Manuale - 1507.1 - R2 G
R
1
K 2
4
.B
_
E
N
SUMMARY
SUMMARY
INTRODUCTION
4
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. UNPACKING
10
1.1.5. OVERALL DIMENSIONS
11
1.1.6. JIG
11
1.1.7. POSITIONING AND MINIMAL TECHNICAL SPACES
12
1.1.8. CIRCULATOR PREVALENCE/FLOW DIAGRAM
13
1.1.9. HYDRAULIC CONNECTION
14
1.1.10. SYSTEM FILLING
15
1.1.11. FILLING THE CONDENSATE COLLECTION SIPHON
16
1.1.12. ANTI-FREEZE PROTECTION
17
1.1.13. GAS CONNECTION
18
1.1.14. ELECTRICAL CONNECTION
18
1.1.15. POWER SUPPLY
19
1.1.16. OPTIONAL ELECTRICAL CONNECTIONS
20
1.1.17. DHW SENSOR INSTALLATION
22
1.1.18. FUME EXHAUST FITTINGS
23
1.1.19. INSTALLATION MODES (IN ACCORDANCE WITH UNI 10642)
24
1.1.20. TYPES OF FUME EXHAUST SYSTEMS
26
2. SUPPORT CENTRE SECTION
29
2.1. FIRST START-UP
30
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
30
2.1.2. BOILER COMMISSIONING
31
2.1.3. CO2 VALUE CHECK AND CALIBRATION
32
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
33
2.1.5. DIGITECH CS PARAMETERS TABLE
35
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
42
2.2. MAINTENANCE
43
2.2.7. GENERAL MAINTENANCE WARNINGS
43
2.2.8. TECHNICAL DATA
45
2.2.9. TECHNICAL ASSEMBLY
47
2.2.10. HYDRAULIC BOARD
48
2.2.11. 3-WAY VALVE OPERATION
49