43
R1K 24 /B - RAD - ING - Manuale - 1507.1 - R2 G
2 Av
ve
rte
nz
e gener
ali
pe
r la
m
an
ute
nz
io
ne
_c
on
bin
ata
_c
on
d_
E
N
2. MAINTENANCE
SUPPOR
T
C
ENTRE
2.2. MAINTENANCE
2.2.7. GENERAL MAINTENANCE
WARNINGS
ATTENTION
All maintenance operations must be
performed in compliance with standards UNI 7129-
3: 2008 and subsequent amendments by qualified
staff in accordance with art. 3 of D.M. n°37 dated
22.01.2008. and authorized by RADIANT BRUCIATORI
spa.
WARNING
In accordance with art. 11 of D.P.R. 412/93
and subsequent amendments, the maintenance
operations must be performed once every twelve
months starting from the boiler installation date.
WARNING
To ensure greater life span and proper
operation of the device, during the maintenance
operations use only original spare parts.
DANGER
Before each components cleaning or
replacement operation, ALWAYS cut off the POWER,
WATER and GAS supply of the boiler.
Please perform the following operations once a
year:
› check the sealing of the gas components, and
replace if necessary the gaskets;
› check the sealing of the water components, and
replace if necessary the gaskets;
› visually check the flame and the condition of the
combustion chamber;
› if necessary make sure that the combustion
is suitably adjusted and if required proceed as
indicated in section “CO2 VALUE CHECK AND
CALIBRATION”;
› remove and clean the burner from oxidation;
› check the integrity and the position of the sealed
chamber sealing gasket;
› check the primary exchanger, if necessary,
clean it;
› check the operation of the gas light up and
safety systems. If necessary, remove and clean
the flame detection and light up electrodes from
incrustations paying attention to respect the
distances with respect to the burner;
› check the heating circuit safety systems: limit
temperature safety thermostat; limit pressure
safety;
› check the pre-load pressure of the expansion
vessel;
› make sure that the permanent ventilation outlets
are present, correctly sized and functioning,
based on the installed devices. Respect the
requirements provided by Local and National
legislation;
› periodically check the integrity of the fume
exhaustion system for safety and proper
operation;
› check that the wiring is performed in compliance
with the requirements in the boiler instruction
manual;
› check the wiring inside the control panel;
› check the flow and temperature of domestic hot
water;
› check the proper operation of the condensate
draining system, including the devices outside
the boiler such as condensate collection devices