background image

10

11

RE-SANITATION AND FILTER

CHANGE PROCEDURE

Sanitation is required at an annual service, 

where the carbon filter is also changed. To ster-

ilize the water heater and chiller system and 

change filter at service intervals, use the follow-

ing procedure.

1. Turn the water off to the water heater 553-B.

2. Run chilled and boiling water at the tap to 

ensure you have depressurized the system and 

no water is coming out.

3. Unscrew stainless steel filter housing, taking 

care not to spill the water as it comes loose. 

(use a cloth) Carefully unscrew the filter at-

tached inside by unscrewing the plastic rim.

5. Refit the housing to the system and activate

the water supply.

6. Run the water through chilled, then the spar-

kling, then the boiling in this sequence. Until you 

can smell chlorine in the water.

7. Turn off the water supply, depressurize Qua-

treau Unit through chilled / boiling function, then 

remove the stainless housing again.

8. 

(1)

 Empty the water in the stainless steel 

housing. 

(2)

 Remove wrapper of the F-PRO- 

Block Carbon filter and 

(3)

 insert it into the 

stainless steel housing.

4. Pour out the water and remove the filter – 

then add some water and mix 30ml of Milton (or 

equivalent) chlorine to produce a dilute solution.

1

2

3

RE-SANITATION AND FILTER CHANGE

TECHNICAL DETAILS

x

Summary of Contents for SMARTTAP 553-B

Page 1: ...INSTALLATION MANUAL BOILING CHILLED SPARKLING 220V 50Hz...

Page 2: ...LIST 2 UNPACKING YOUR EQUIPMENT 3 INSTALLING QUATREAU SMARTTAP 3 4 INSTALLING AIRGAP DRAIN 5 INSTALLING VENTILATION CHILLER UNIT 6 CONNECTING WATER SUPPLY 7 8 INSTALLING CHILLER CARBONATOR 9 TECHNICAL...

Page 3: ...the Quatreau SmartTap to inspect the components and installation kit Use the packaging to prevent damage until ready to fit the work surface The heater control unit always sits to the right hand side...

Page 4: ...nd in the installation kit Be careful not to lose any parts Locate a suitable position on the approved sanitary drain where the saddle clamp can be fixed and ensure that the check valve elbow and air...

Page 5: ...tallation kit to this 6 35mm connec tion on the mains supply push in firmly then cut it at a length that extends to the front of the cupboard where the water heater inlet will sit 3 In the fitting kit...

Page 6: ...NOTE Ensure that you leave a 1 25 4mm gap around the chiller unit s sides enabling ven tilation and air movement without which the system will not chill correctly DO NOT TURN ON THE POWER TO THE CHILL...

Page 7: ...crew the filter at tached inside by unscrewing the plastic rim 5 Refit the housing to the system and activate the water supply 6 Run the water through chilled then the spar kling then the boiling in t...

Page 8: ...tight the stain less steel housing 12 The optimum contact time for chlorine or sterilizing fluid is 15 minutes before flushing through 13 When ready turn off the water supply back on and run off a few...

Reviews: