background image

6

7

INSTALLING VENTILATION - CHILLER UNIT

CONNECTING WATER SUPPLY

Ventilation will ensure your chiller performs to 

its specifications. Failure to install this will void 

the warranty on this module.

1. Inside the packing, you will find cutting tem-

plates. Choose the CS20 base and front grill. 

2. Drop the kick board and check underneath 

the cupboard’s left side for any pipes or electri-

cal wires that may be in the way. 

Ensure they are moved before starting to cut 

the ventilation.

3. Locate the base cutting template inside the 

cupboard’s left side, mark the 4 corners, and 

cut the ventilation hole into the base.

4. Install the vent kit (steel angle piece) provid-

ed and insert the vent duct so that it runs to the 

front of the cupboard. Mark off the point where 

it crosses the kickboard and cut to length using 

a suitable hand saw.

5. Using the template for the kick board vent 

grill, mark the location for the screws and cut 

out area and cut out.

1. Connect your cold water supply using the 1/4” 

(6.35mm) blue tubing that is supplied in the kit. 

Connect it to the right side of the boiler. 

2. Connect the blue ¼”(6.35mm) tube found in 

the installation kit to this ¼” (6.35mm) connec-

tion on the mains supply (push in firmly), then 

cut it at a length that extends to the front of the 

cupboard where the water heater inlet will sit.

3. In the fitting kit, you will find a 1/4” (6.35mm) 

filter screen. Fit this in the same line to the boil-

er to protect the inlet solenoid from particles 

that can stop it from closing. 

*Illustration next page

4. Slide the QST553-B (the water heater) into 

the place on the right side of the cupboard. 

Connect the ¼” (6.35mm) pipe from the isola-

tor into the front right-hand side port.

5.  Now 

(1)

 turn on the cold water supply and 

(2) 

turn on the isolator, check the connections are 

water-tight.

DO NOT PLUG IN THE WATER HEATER UNTIL 

INSTRUCTED TO DO SO.  

6. Fix grill to front and 

replace the kick board 

so that it marries up 

with the vent duct. 

SECTION FOUR

INSTALLING THE VENTILATION 

FOR THE CHILLER UNIT

SECTION FIVE

CONNECTING WATER SUPPLY

6. In your installation kit, you will find a length of 

silicone tube with a VenturiT™ connector. Con-

nect the shortest distance (above the T) to ei-

ther of the two (2) pipes protruding from the 

base of the faucet, using the spring clips to se-

cure the tubing.

When pushing the silicon onto the tap stem 

avoid pulling these down onto the silicon. Be 

sure to push up onto the stems or they will be-

come dislodged from the spout tip.

Summary of Contents for SMARTTAP 553-B

Page 1: ...INSTALLATION MANUAL BOILING CHILLED SPARKLING 220V 50Hz...

Page 2: ...LIST 2 UNPACKING YOUR EQUIPMENT 3 INSTALLING QUATREAU SMARTTAP 3 4 INSTALLING AIRGAP DRAIN 5 INSTALLING VENTILATION CHILLER UNIT 6 CONNECTING WATER SUPPLY 7 8 INSTALLING CHILLER CARBONATOR 9 TECHNICAL...

Page 3: ...the Quatreau SmartTap to inspect the components and installation kit Use the packaging to prevent damage until ready to fit the work surface The heater control unit always sits to the right hand side...

Page 4: ...nd in the installation kit Be careful not to lose any parts Locate a suitable position on the approved sanitary drain where the saddle clamp can be fixed and ensure that the check valve elbow and air...

Page 5: ...tallation kit to this 6 35mm connec tion on the mains supply push in firmly then cut it at a length that extends to the front of the cupboard where the water heater inlet will sit 3 In the fitting kit...

Page 6: ...NOTE Ensure that you leave a 1 25 4mm gap around the chiller unit s sides enabling ven tilation and air movement without which the system will not chill correctly DO NOT TURN ON THE POWER TO THE CHILL...

Page 7: ...crew the filter at tached inside by unscrewing the plastic rim 5 Refit the housing to the system and activate the water supply 6 Run the water through chilled then the spar kling then the boiling in t...

Page 8: ...tight the stain less steel housing 12 The optimum contact time for chlorine or sterilizing fluid is 15 minutes before flushing through 13 When ready turn off the water supply back on and run off a few...

Reviews: