background image

 

 PX502 Tape Library Quick Start Guide

3

By following these instructions, you help ensure that the 
system will continue to be safeguarded after it arrives at the 
installation site.

Unpack and remove the following components from the 
packing materials (see 

figure 2

):

1

Remove the accessories kit and set it aside.

2

With the help of a second person, lift the library chassis 
up and out of the shipping carton.

3

Place the library on a table approximately waist high.

Figure 2  Unpacking the PX502

N

OTE

:

Unpack the library as close to the installation 
location as possible.

W

ARNING

:

At least two people are required to move the 

library chassis.

C

AUTION

:

Lift the library chassis at the sides. Avoid 

putting the weight of the library chassis on 
the front bezel.

Accessory kit

Foam

PX502 tape 
library

Foam

Front bezel

Lift point

4

Remove the antistatic sheet:

a

Cut the tape strips securing the sheet.

b

Fold the sheet down.

c

With the help of a second person, lift the library up 
off of the antistatic sheet.

d

Place the library on the table or desk next to the 
antistatic sheet.

e

If this is a multiple library stack, refer to “Multiple 
Library Stacks” on page 15 before proceeding.

The PX502 is ready to install.

Installing the Library

0

Installing a PX502 tape library in a rack consists of the 
following steps:

Locating the Mounting Position

Installing the Library

Initial Configuration

Locating the Mounting 
Position

0

The PX502 tape library is designed to fit in a standard 19 
inch wide rack.
It is important to the library installation to locate the hole 
pattern in the rack rails (see 

figure 3

). The library must be 

installed at the beginning of the hole pattern. Refer to 

table 2

 for information on common rack hole types.

Summary of Contents for PX502

Page 1: ...cartridges see figure 1 Notational Conventions 0 This instruction uses the following conventions This document explains how to unpack the PX502 tape library and install it in a standard 19 in rack On...

Page 2: ...ng Necessary Tools 0 Provide the following tools for unpacking and installing the PX502 tape library 1 PHILLIPS screwdriver 2 PHILLIPS screwdriver 1 flat blade screwdriver Allen wrench 2 5mm and 3mm i...

Page 3: ...sory kit Foam PX502 tape library Foam Front bezel Lift point 4 Remove the antistatic sheet a Cut the tape strips securing the sheet b Fold the sheet down c With the help of a second person lift the li...

Page 4: ...Shelves Installing the Library Chassis Cabling the Library WARNING If the rack is empty at the time of installation do NOT install the PX502 tape library too high in the rack The weight of the librar...

Page 5: ...03 screws 2 sets Back bracket hardware M5 x 8 allen screws and mounting plate PN 74 88057 01 bracket PN 90 87275 01 screws 2 sets Back clamp hardware M5 x 10 and back clamp PN 90 87343 08 screws PN 7...

Page 6: ...opening toward back of rack Front of rack Back of rack Back of rack Front of rack Figure 5 Assembling the Left and Right Rack Mount Shelves c Determine the type of rail adapter required for your rack...

Page 7: ...readed circle hole patterns M6 on one side and M5 on the other side Figure 7 Assembling the Left Hand Rack Mount Shelf 2 Install the left and right rack mount shelves into the rack the rack mount shel...

Page 8: ...k Mount Shelves Installing the Library Chassis 0 1 The back mounting brackets are lettered A through I so the correct mounting position is easily determined The mounting positions differ depending on...

Page 9: ...n Use holes G and I X 34 5 to 35 5 in Use holes F and H X 35 5 to 36 5 in Use holes G and I X NOTE If your rack has a depth less than 27 in the back brackets and back clamps are not used 1 Holes 2 Hol...

Page 10: ...unting brackets or clamps Left hand back bracket shown M5 x 10 Allen screws PHILLIPS screws Back mounting clamp Figure 13 Removing the Tape Drive Cover Plates b Insert the tape drive s into the drive...

Page 11: ...drive 1 Tape drive 2 Back of Library SCSI host Ethernet Power Surrogate System Controller Board Tape drive 2 Tape drive 1 Figure 17 PX502 Cable Configuration Native Fibre Channel 2 Connect one end of...

Page 12: ...o gain further access to the internal packaging restraints see figure 19 If there is no space above the PX502 library to remove the top cover continue with Step 3 CAUTION Take standard ESD precautions...

Page 13: ...Avoid touching the printed circuit board CAUTION When removing the foam restraints ensure that the robotics umbilical cable is lying down in the correct position inside the platform and not across th...

Page 14: ...er Table 5 Setting Up the Cabinet Setting the Date and Time 0 To set the date and time 1 From the Setup screen use the up and down arrows to highlight Date and Time and press Enter The Date and Time s...

Page 15: ...re 18 The library shuts down 4 Push the power button to start the library The PX502 tape library is initially configured and ready for use NOTE If you are using DHCP you do not have to setup the follo...

Page 16: ...81 81292 03 B01 81 81292 03 B01 Figure 25 Removing the FlexLink Cover 2 The alignment hardware installed on the top and bottom of the libraries in a multiple stack allow the FlexLink bays to align cor...

Reviews: