Appendix B Relocating the Library
Checking the New Installation Site
104
Quantum P4000 and P7000 Libraries User’s Guide
Checking the New Installation Site
2
Check the new installation site for the library using the guidelines found
in the
P4000 and P7000 Pre-Installation Site Survey Instructions
. Make sure
the new location meets all applicable clearance, environmental, and
power requirements.
Preparing the Library for Relocation
2
The following tools are required to prepare the library for relocation:
• #2 PHILLIPS® head screwdriver
• 3/16-inch Allen® wrench
To prepare the library for relocation:
• Removing tape cartridges
• Installing internal packing materials
• Disconnecting library cables
Caution:
Moving or shipping the library without proper packing
materials can result in damage to library components.
Caution:
Always prepare the library for relocation before any move.