background image

Document 6221100-02, Ver. 2, Rel. 0

March 1999

1

ATL P1000 Series Library 
Unpacking Instructions

0

Introduction....................................................................................................3

Selecting an Installation Location ...............................................................5

Floor Space...............................................................................................5

Floor Clearance .......................................................................................6

Floor Strength and Inclination ..............................................................6

Overhead Clearance ...............................................................................6

Power and Grounding ...........................................................................6

Power Inlet ........................................................................................7

Rack Current Rating Consideration ..............................................7

Grounding .........................................................................................7

Temperature......................................................................................7

Environmental Requirements ...............................................................7

Unpacking the Library..................................................................................8

Unloading Space Requirements ..................................................................9

Uncrating the Library .................................................................................10

Installing the Slide Assembly in the Rack................................................13

Verifying the Rack Requirements.......................................................13

Rack Current Rating Consideration ............................................13

Grounding .......................................................................................14

Temperature....................................................................................14

Determining the Mounting Position ..................................................14

Installing the Slide Assembly in the Rack .........................................15

Summary of Contents for P1000 Series

Page 1: ...Power and Grounding 6 Power Inlet 7 Rack Current Rating Consideration 7 Grounding 7 Temperature 7 Environmental Requirements 7 Unpacking the Library 8 Unloading Space Requirements 9 Uncrating the Libr...

Page 2: ...ts 17 Adjusting the Slide Assembly Tray on the Slide Rails 19 Removing the Library from the Pallet 22 Removing a Stand alone Library from the Pallet 22 Removing a Rack mount Library from the Pallet 24...

Page 3: ...p the library using the instructions in the ATL P1000 Series Library User s Guide The P1000 library is shipped in either a stand alone see figure 1 or rack mount configuration see figure 2 The stand a...

Page 4: ...Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 4 Introduction Figure 2 ATL P1000 Series Library Rack mount Configuration Key lock Bulk pack door Power switch GUI Load port Load pac...

Page 5: ...ider the following requirements floor space floor clearance floor strength and inclination power and grounding environmental conditions These requirements are also described in the ATL P1000 Series Li...

Page 6: ...nt to support a fully loaded P1000 on the floor or in a rack The floor at the installation site must be level to within 0 25 in 6 4 mm over a 6 ft by 6 ft 1 8 m by 1 8 m area Overhead Clearance 4 To r...

Page 7: ...ibraries can be installed in a typical 15A 120V rack If other equipment is installed in the rack determine the total current rating of all the equipment before adding the P1000 library to the rack Gro...

Page 8: ...slide assembly in the rack rack mount library only see Installing the Slide Assembly in the Rack on page 13 removing the library from the pallet see Removing the Library from the Pallet on page 22 rem...

Page 9: ...brary verify that you have sufficient space For the stand alone unit allow a minimum of six feet in front of the ramp side of the pallet see figure 6 Note Unpack the library as close to the installati...

Page 10: ...ocedure 1 Open the top of the shipping carton by carefully cutting the packaging tape The following items are stacked on top of the P1000 accessories tray ramp stand alone library or slide assembly ra...

Page 11: ...P1000 Series Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 Uncrating the Library 11 Figure 7 Uncrating the Stand alone Library Accessories tray Ramp Foam supports Library C...

Page 12: ...carton to the pallet To release a clip pinch the center tabs of the clip firmly together and pull on the tabs 5 Lift the carton off of the pallet and set it aside 6 Compare the contents of the shippi...

Page 13: ...ruction make it awkward to handle The library weighs 89 lbs 40 kg it must be lifted with assistance Failure to follow these guidelines may result in equipment damage or personal injury Warning When in...

Page 14: ...he desired mounting position for the library see figure 9 The library and slide assembly require at least 21 in 54 cm or 12 rack units of vertical clearance To ensure stability mount the library low i...

Page 15: ...lide assembly in the rack see figure 10 on page 16 Procedure 1 Loosen but do not remove the nuts holding the rear mounting brackets to the slide assembly 2 Measure the depth of the rack from the outsi...

Page 16: ...8 Remove the two 10 32 x 3 4 in temporary support screws from the rear retma rails and use them to finish securing the rear mounting brackets to the rack retma rails Note Do not tighten the nuts secur...

Page 17: ...2 cm from the front of the rack If the slide assembly and rack do not meet the above requirements complete the procedures in this section to adjust the slide assembly The number of adjustments requir...

Page 18: ...annels are secured by the intermediate channel locks which are located on the inner back edge of the intermediate channels d Release the intermediate channel locks by rotating them upward slightly Not...

Page 19: ...Slide Assembly Tray on the Slide Rails 12 To adjust the slide assembly tray on the slide rails Procedure 1 Loosen the inner nuts on both sides of the slide assembly see figure 13 Access these nuts fr...

Page 20: ...f the rack until both the intermediate and inner channels of the slide rails lock see figure 12 This allows you to access the front screws b Tighten each of the front nuts by holding the nut with an 1...

Page 21: ...g its corresponding nut with an 11 32 inch open ended wrench f Repeat steps 3d and 3e to tighten the remaining inner nuts g Push the slide assembly tray back into the rack 4 Check for adequate clearan...

Page 22: ...pallet see Removing a Rack mount Library from the Pallet on page 24 Warning Two people should perform steps that involve lifting or guiding the library Use safe practices when lifting or guiding the...

Page 23: ...ch the ramp to the pallet using fastener strips see figure 15 4 Make any necessary preparations for moving the library This may involve clearing a path to the installation site unlocking doors and pla...

Page 24: ...d the slide assembly in the rack If you have not do so now following the instructions in Installing the Slide Assembly in the Rack on page 13 Procedure 1 Remove the plastic bag enclosing the library a...

Page 25: ...2 Ver 2 Rel 0 March 1999 Removing the Library from the Pallet 25 Procedure continued 3 With the help of a second person lift the library from the pallet see figure 16 Figure 16 Lifting the Rack mount...

Page 26: ...the Library on the Slide Assembly Tray 5 Secure the library to the slide tray using six screws from the accessories kit see figure 17 6 Verify that when the slide assembly is fully extended there is a...

Page 27: ...tinued 8 To prevent the library from sliding out of the rack during operation secure the locking brackets to the retma rails see figure 18 Figure 18 Locking the Slide Tray in the Rack 9 Save the shipp...

Page 28: ...damage the library Caution Take precautions to prevent electrostatic discharge whenever you remove the library enclosure or open the library doors Opening the Doors 18 To open the library doors Proce...

Page 29: ...carefully push inward at both corners while lifting it up at an angle see figure 20 The tab on the shipping restraint between the mounting blocks for the load and bulk packs pops up releasing the ship...

Page 30: ...s Library Unpacking Instructions Document 6221100 02 Ver 2 Rel 0 March 1999 30 Removing the Internal Packing Materials Figure 20 Removing the Shipping Restraint Extension axis assembly Drive shelf Shi...

Page 31: ...Still holding the load pack handles pull the load pack forward and out of the library c Repeat steps 4a and 4b to remove the bulk pack Note In order to install the shipping restraint the gripper must...

Page 32: ...shipping restraint snaps into place 7 Replace the load and bulk packs 8 Close and lock the library doors 9 Recrate the library a Place the library in the shipping bag b Place the library on the shipp...

Reviews: