Chapter 3 Operation
Creating a Protection Plan
GoVault™ Data Protection Software, Version 1.0 User’s Guide
31
Specifying a Run
Schedule
3
The final step in creating a protection plan is using the
Schedule
tab
dialog to specify the times that you want the plan to run (see
figure 21
).
Figure 21 Schedule Tab
1
Use the schedule options and list boxes to specify how and when you
want to run your protection plan:
Select this option . . .
If you want the GoVault data
protection software to run your
protection plan . . .
No Schedule
only when you launch it manually from
the GoVault data protection software
Home
page.
In this case, your protection plan will
not run on any scheduled basis.