LECTRICAL

 

29) Refer to 

Fig 8 Wiring Diagram 

for all steps 

under this heading.

 

Single Phase 

30) Connect the Overhead Limit Switch Cord to 

Power Unit as shown. 

31) Connect Power Unit to suitable electrical 

source as shown. 

Three Phase 

32) Power unit is factory wired for 240 volt.  

Refer to wiring diagram or motor plate for 
optional voltages. 

33) 

Connect Contactor Enclosure to column. 

 

Mounting hardware should be centered on 
the column side to side to avoid the path of 
the slide blocks. 

34) Connect Overhead Limit Switch Cord to 

Contactor as shown.

 

35) Connect Contactor to Power unit as shown. 

Connect Contactor to suitable electrical 
source as shown. 

IMPORTANT

: A

FTER WIRING HAS BEEN 

COMPLETED

TEST OPERATION OF 

P

OWER 

U

NIT 

O

VERHEAD 

L

IMIT SWITCH

.

 

W

HILE RAISING LIFT

OPERATE 

O

VERHEAD 

S

HUTOFF 

B

AR

. P

OWER 

U

NIT 

M

OTOR SHOULD STOP WHEN 

S

HUTOFF 

B

AR IS 

RAISED

.

 

F

INAL 

A

DJUSTMENTS

 

H

YDRAULICS

 

36) Lower the lift to the floor and raise the lift 

approximately one foot. 

37) Start with Idler side first. Slowly and carefully 

loosen the bleed plug on top side of the 
cylinder just enough to allow the entrapped 
air to escape. Repeat for power side. 

38) Raise lift 6 inches. Repeat step 32 until no air 

comes out of cylinder. 

39) Pressure test hydraulic system. Energize 

power unit, raise lift to full rise and continue 
to run motor for additional 10 seconds. 
(NOTE: pressure relief will make a high pitch 
squeal sound for these 10 seconds.) Check 
hydraulic system for leaks.  

40) Energize power unit again for 10 seconds. 

With a clean rag, wipe down both cylinder 
rods. (The cylinders are shipped with a small 
amount of clear anti-corosive lubricant that 
will be forced out through the wiper when the 
lift reaches full rise.) 

If lubricant is not 

wiped clean from the cylinder rod, the 
cylinder will apear to be leaking

S

YNCHRONIZING 

C

ABLES

 

41) Raise lift and insure carriages lower into 

same lock position. 

42) Adjust synchronizing cables so the tension is 

equal in both cables and carriages are firmly 
sitting on locks. 

43) Cycle lift to insure that latches operate 

simultaneously. 

L

OCK 

R

ELEASE 

C

ABLE

 

44) Raise lift to a lock position but don’t set into 

the lock.  Pull and release Power Column 
lock release handle while watching Idler 
Column lock. Adjust Cable tension by 
removing slack and retightening cable clamp 
at the power side. 

IMPORTANT: I

F IDLER 

SIDE LOCK PAWL DOES NOT FULLY DISENGAGE

DAMAGE MAY RESULT TO IDLER SIDE CARRIAGE 

AND OR CABLE SYNCHRONIZING SYSTEM

.  

45) Remove lock release knob and install both 

covers.  Replace lock release knob. 

 
O

WNER

/O

PERATOR 

C

HECKLIST

 

46) Demonstrate the operation of the lift to the 

owner/operator and review correct and safe 
lifting procedures using the 

Lifting It Right

 

booklet as a guide. 

47) Complete the Installation Checklist/Warranty 

Validation questionnaire with the owner. 
Review the terms of the warranty registration 
card, and return the card and a copy of the 
questionnaires to: 

 

QUALITY LIFTS, LLC

 

200 Cabel St., P.O. Box 3972, 

Louisville, KY  40206 

Summary of Contents for Q10

Page 1: ...Lift MODEL Q10 10 000 LBS CAPACITY 2500 LBS PER ARM QUALITY LIFTS LLC 200 Cabel St P O Box 3972 Louisville KY 40206 FAX 502 583 5488 TOLL FREE 877 771 5438 E mail sales qualitylifts com www qualitylif...

Page 2: ...3314mm F Short Arm Reach 21 3 4 39 1 4 553mm 998mm G Long Arm Reach 38 1 4 55 3 8 971mm 1407mm H Screw Pad Height 4 1 4 7 3 4 109mm 199mm K Inside of Columns 110 1 4 2800mm Lifting Capacity 10 000 lbs...

Page 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Page 4: ...Arm Assembly 2 Synchronizer Cable Assembly 1 Hydraulic Hose Pack 1 Power Lock Cover 1 Idler Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a...

Page 5: ...echeck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under th...

Page 6: ...Cord Lock Release Cable Hydraulic Hose Synchronizing Cables Fig 6 Hose Routing Power Side 23 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the col...

Page 7: ...pressure relief will make a high pitch squeal sound for these 10 seconds Check hydraulic system for leaks 40 Energize power unit again for 10 seconds With a clean rag wipe down both cylinder rods The...

Page 8: ...1 5 4 6 Normally Open M Wiring Diagram A2 A1 T9 T5 T4 T6 M T8 T3 T7 T2 T1 1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FOR SINGLE PHASE FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9...

Page 9: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Page 10: ...he lock release lever 4 Lower the vehicle by depressing the lowering valve handle 5 Continue to lower the vehicle until the carriages stop against the base plate Retract the extension arms and park th...

Page 11: ...Model Q10 Installation Operation and Maintenance Page 11 Rev 10 22 08 Q10 IOM Q doc Parts Breakdown...

Page 12: ...Model Q10 Installation Operation and Maintenance Page 12 Rev 10 22 08 Q10 IOM Q doc...

Page 13: ...wl 61 JSJ5B 09 02 00CH 2 Rear Male Arm 17 X10 029 2 Washer 62 JSJ5B 09 01 00B 2 Rear Female Arm 18 X10 030 4 Pulley Axle 63 X10 073 6 Washer 10mm 19 X10 031 4 Pulley 64 X10 074 18 Spring Washer 10mm 2...

Reviews: