background image

Model Q10 

Installation, Operation and Maintenance 

 Page 

 

Rev. 10/22/08

 

 

 

Q10-IOM-Q

.doc 

G

ENERAL 

S

PECIFICATIONS

 

See Figure 1 

Q10 

A

    Rise Height (Screw Pads Highest Position)

 

78 3/4" (2000mm) 

B

    Overall Height (Adjustable)

 

147 1/2" (3748mm) / 137 1/2" (3494mm) 

C

    Overall Width

 

131 3/4" (3347mm) 

D

    Drive-Thru Clearance

 

98 3/8" (2499mm) 

E

    Floor to Overhead Switch

 

140 1/2" (3568mm)/ 130 1/2" (3314mm) 

F

    Short Arm Reach

 

21 3/4"-39 1/4" (553mm-998mm) 

G

    Long Arm Reach

 

38 1/4"-55 3/8" (971mm-1407mm) 

H

    Screw Pad Height

 

4 1/4"-7 3/4" (109mm-199mm) 

K

    Inside of Columns

 

110 1/4" (2800mm) 

Lifting Capacity * 

10,000 lbs. (4536 kg) 

Ceiling Height Required 

149" (3785mm) 

Motor 

2HP, Single Phase, 60Hz 

Voltage 208-230 
Speed of Rise ** 

52 seconds 

Max Load Per Arm 

2500 lbs (1134 kg) 

* Lift capacity ratings are based on loads equally distributed on all four arms. 
** Lifting and lowering speeds may vary depending on the weight of the vehicle. 
 
 

          

    

 
 

Fig 1a - General Specifications 

Fig1b - Service Bay Lay

out

 

 

 

 

Summary of Contents for Q10

Page 1: ...Lift MODEL Q10 10 000 LBS CAPACITY 2500 LBS PER ARM QUALITY LIFTS LLC 200 Cabel St P O Box 3972 Louisville KY 40206 FAX 502 583 5488 TOLL FREE 877 771 5438 E mail sales qualitylifts com www qualitylif...

Page 2: ...3314mm F Short Arm Reach 21 3 4 39 1 4 553mm 998mm G Long Arm Reach 38 1 4 55 3 8 971mm 1407mm H Screw Pad Height 4 1 4 7 3 4 109mm 199mm K Inside of Columns 110 1 4 2800mm Lifting Capacity 10 000 lbs...

Page 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Page 4: ...Arm Assembly 2 Synchronizer Cable Assembly 1 Hydraulic Hose Pack 1 Power Lock Cover 1 Idler Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a...

Page 5: ...echeck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under th...

Page 6: ...Cord Lock Release Cable Hydraulic Hose Synchronizing Cables Fig 6 Hose Routing Power Side 23 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the col...

Page 7: ...pressure relief will make a high pitch squeal sound for these 10 seconds Check hydraulic system for leaks 40 Energize power unit again for 10 seconds With a clean rag wipe down both cylinder rods The...

Page 8: ...1 5 4 6 Normally Open M Wiring Diagram A2 A1 T9 T5 T4 T6 M T8 T3 T7 T2 T1 1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FOR SINGLE PHASE FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9...

Page 9: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Page 10: ...he lock release lever 4 Lower the vehicle by depressing the lowering valve handle 5 Continue to lower the vehicle until the carriages stop against the base plate Retract the extension arms and park th...

Page 11: ...Model Q10 Installation Operation and Maintenance Page 11 Rev 10 22 08 Q10 IOM Q doc Parts Breakdown...

Page 12: ...Model Q10 Installation Operation and Maintenance Page 12 Rev 10 22 08 Q10 IOM Q doc...

Page 13: ...wl 61 JSJ5B 09 02 00CH 2 Rear Male Arm 17 X10 029 2 Washer 62 JSJ5B 09 01 00B 2 Rear Female Arm 18 X10 030 4 Pulley Axle 63 X10 073 6 Washer 10mm 19 X10 031 4 Pulley 64 X10 074 18 Spring Washer 10mm 2...

Reviews: