WARNING

V

ERTICAL 

C

LEARANCE

 

Check the height of the area where the lift is to 
be installed. Clearance should be calculated 
based on the full raised height of the lift. 

Failure by purchaser to 
provide adequate 
clearance could result in 

unsatisfactory lift performance, property 
damage, or personal injury. 

F

LOORING

 

Be certain you have the proper concrete floor to 
properly handle the loaded lift. Floor should be in 
generally good condition with no large cracks, 
spalling or deterioration.  

Minimum requirements for concrete are 4 
inches minimum depth, with steel 
reinforcement, 3500 psi, cured for 28 days per 
local commercial practice

. Floor should be 

level within 3/8 inch over the installation area. No 
anchors should be installed within 8 inches of any 
crack, edge, or expansion joint. If these 
conditions cannot be met, a pad may be poured 
to accommodate the lift.  

Check with local building inspectors and/or 
permits office for any special instructions or 
approvals required for your installation. 

Failure by purchaser to 
provide the recommended 
mounting surface could 

result in unsatisfactory lift performance, 
property damage, or personal injury. 

L

OCATION

 

This lift has been evaluated for indoor use only 
with an operating ambient temp. range of 5 – 
40°C  (41

 104°F) 

E

LECTRICAL 

R

EQUIREMENTS

 

For lift installation and operation for single phase 
units, it is necessary to have a dedicated circuit 
with a double pole 25 amp circuit breaker or time 
delay fuse. 

S

AFETY 

N

OTICES AND 

D

ECALS

 

For your safety, and the safety of others, read 
and understand all of the safety notices and 
decals included here. 

R

EAD ENTIRE MANUAL BEFORE 

ASSEMBLING

INSTALLING

OPERATING

OR SERVICING THIS 

EQUIPMENT

P

ROPER MAINTENANCE AND 

INSPECTION IS NECESSARY FOR SAFE 

OPERATION

DO NOT 

OPERATE A DAMAGED LIFT

Safety decals similar to those shown here are 
found on a properly installed lift. Be sure that all 
safety decals have been correctly installed on the 
Power Unit reservoir. Verify that all authorized 
operators know the location of these decals and 
fully understand their meaning. Replace worn, 
faded, or damaged decals promptly. 

Do not attempt to raise a 
vehicle on the lift until the 
lift has been correctly 

installed and adjusted as described in this 
manual.  
 

 

 

  

WARNING

WARNING

Summary of Contents for Q10

Page 1: ...Lift MODEL Q10 10 000 LBS CAPACITY 2500 LBS PER ARM QUALITY LIFTS LLC 200 Cabel St P O Box 3972 Louisville KY 40206 FAX 502 583 5488 TOLL FREE 877 771 5438 E mail sales qualitylifts com www qualitylif...

Page 2: ...3314mm F Short Arm Reach 21 3 4 39 1 4 553mm 998mm G Long Arm Reach 38 1 4 55 3 8 971mm 1407mm H Screw Pad Height 4 1 4 7 3 4 109mm 199mm K Inside of Columns 110 1 4 2800mm Lifting Capacity 10 000 lbs...

Page 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Page 4: ...Arm Assembly 2 Synchronizer Cable Assembly 1 Hydraulic Hose Pack 1 Power Lock Cover 1 Idler Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a...

Page 5: ...echeck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under th...

Page 6: ...Cord Lock Release Cable Hydraulic Hose Synchronizing Cables Fig 6 Hose Routing Power Side 23 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the col...

Page 7: ...pressure relief will make a high pitch squeal sound for these 10 seconds Check hydraulic system for leaks 40 Energize power unit again for 10 seconds With a clean rag wipe down both cylinder rods The...

Page 8: ...1 5 4 6 Normally Open M Wiring Diagram A2 A1 T9 T5 T4 T6 M T8 T3 T7 T2 T1 1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FOR SINGLE PHASE FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9...

Page 9: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Page 10: ...he lock release lever 4 Lower the vehicle by depressing the lowering valve handle 5 Continue to lower the vehicle until the carriages stop against the base plate Retract the extension arms and park th...

Page 11: ...Model Q10 Installation Operation and Maintenance Page 11 Rev 10 22 08 Q10 IOM Q doc Parts Breakdown...

Page 12: ...Model Q10 Installation Operation and Maintenance Page 12 Rev 10 22 08 Q10 IOM Q doc...

Page 13: ...wl 61 JSJ5B 09 02 00CH 2 Rear Male Arm 17 X10 029 2 Washer 62 JSJ5B 09 01 00B 2 Rear Female Arm 18 X10 030 4 Pulley Axle 63 X10 073 6 Washer 10mm 19 X10 031 4 Pulley 64 X10 074 18 Spring Washer 10mm 2...

Reviews: