Model Q10 

Installation, Operation and Maintenance 

 Page 

 

Rev. 10/22/08

 

 

 

Q10-IOM-Q

.doc 

P

OWER 

U

NIT 

& H

YDRAULIC 

L

INES

 

 

 

Fig 5 – 

Power Unit Mounting

 

18) Mount Power Unit to power column as shown 

in 

Fig 5

. The mounting hardware, (4) M8 hex 

nuts, are pre-installed on power unit 
mounting bracket. 

19) Attach Hydraulic elbow fitting threading the 

O-Ring end into the power unit. 

20) 

IMPORTANT – To insure proper hose 
fitting seal without damage to the fitting 
follow this procedure for each hose 
connection:

  Screw flared fitting on finger 

tight. Rotate flared fitting 1 ½ flats or 90 
degrees.  Back the flared fitting off one full 
turn and repeat. 

21) Thread power unit hose (short) to elbow in 

power on power unit. 

22) Beginning on the idler side start with the Idler 

Extension hose at the elbow fitting (This hose 
has a male fitting on one end and is removed  
for reduced height installations). Continue 
with the Idler Column Hose (long) up the 
backside of the column through the two 
capture rings and guide at the top of the 
extension.  Continue across the overhead 
through each of the guides as shown and 
down the backside of the power column.  

See Fig 6.

 

Overhead
Shutoff Cord

Lock Release
Cable

Hydraulic Hose

Synchronizing

Cables

 

Fig 6 – Hose Routing (Power Side)

 

23) Route the remaining Power column hose 

beginning at the elbow fitting at the base up 
the backside of the column.  Join the three 
hoses with the supplied union tee.

 

24) 

B

C

ERTAIN 

A

LL 

F

ITTINGS AND 

C

ONNECTIONS 

ARE 

T

IGHT

I

T IS THE INSTALLERS 

RESPONSIBILITY TO INSURE SYSTEM IS LEAK

-

FREE

Fill the Power Unit with three gallons of 

clean 10wt anti-foam anti-rust hydraulic oil or 
Dexron 

III 

ATF. 

D

N

OT 

U

SE 

O

ILS 

W

ITH 

D

ETERGENTS

.

 

 
L

OCK 

R

ELEASE

 

25) Install Lock Release Stud and Knob to the 

Power Column Lock using one M10 Nut. 

26) 

Attach Mechanical Lock Release Cable 
Assembly to each lock pawl.  See

 Fig 7. 

                 

 

Fig 7 – 

Lock Assembly 

T

HE LOCK RELEASE CABLE ADJUSTMENT IS NOT 

COMPLETE UNTIL THE LIFT HAS BEEN LOWERED AND 

FINAL ADJUSTMENTS

” 

HAVE BEEN MADE

.

 

 
A

RM 

I

NSTALLATION

 

27) Lubricate the arm pin or carriage arm pin 

hole with “anti-seize” and install the arms. 
Insure that the arm restraint gears engage 
and disengage properly. Arm restraints 
should disengage when lift is fully lowered. If 
any binding occurs, insure that the large gear 
mounted to the arm has been factory 
installed tight against the arm pin.

 

28) Extend the footpad to both extents and apply 

anti-seize to the three retaining rings and 
where the double screw makes contact with 
the base of the footpad.    

 

Summary of Contents for Q10

Page 1: ...Lift MODEL Q10 10 000 LBS CAPACITY 2500 LBS PER ARM QUALITY LIFTS LLC 200 Cabel St P O Box 3972 Louisville KY 40206 FAX 502 583 5488 TOLL FREE 877 771 5438 E mail sales qualitylifts com www qualitylif...

Page 2: ...3314mm F Short Arm Reach 21 3 4 39 1 4 553mm 998mm G Long Arm Reach 38 1 4 55 3 8 971mm 1407mm H Screw Pad Height 4 1 4 7 3 4 109mm 199mm K Inside of Columns 110 1 4 2800mm Lifting Capacity 10 000 lbs...

Page 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Page 4: ...Arm Assembly 2 Synchronizer Cable Assembly 1 Hydraulic Hose Pack 1 Power Lock Cover 1 Idler Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a...

Page 5: ...echeck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under th...

Page 6: ...Cord Lock Release Cable Hydraulic Hose Synchronizing Cables Fig 6 Hose Routing Power Side 23 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the col...

Page 7: ...pressure relief will make a high pitch squeal sound for these 10 seconds Check hydraulic system for leaks 40 Energize power unit again for 10 seconds With a clean rag wipe down both cylinder rods The...

Page 8: ...1 5 4 6 Normally Open M Wiring Diagram A2 A1 T9 T5 T4 T6 M T8 T3 T7 T2 T1 1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FOR SINGLE PHASE FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9...

Page 9: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Page 10: ...he lock release lever 4 Lower the vehicle by depressing the lowering valve handle 5 Continue to lower the vehicle until the carriages stop against the base plate Retract the extension arms and park th...

Page 11: ...Model Q10 Installation Operation and Maintenance Page 11 Rev 10 22 08 Q10 IOM Q doc Parts Breakdown...

Page 12: ...Model Q10 Installation Operation and Maintenance Page 12 Rev 10 22 08 Q10 IOM Q doc...

Page 13: ...wl 61 JSJ5B 09 02 00CH 2 Rear Male Arm 17 X10 029 2 Washer 62 JSJ5B 09 01 00B 2 Rear Female Arm 18 X10 030 4 Pulley Axle 63 X10 073 6 Washer 10mm 19 X10 031 4 Pulley 64 X10 074 18 Spring Washer 10mm 2...

Reviews: