Model Q10
Installation, Operation and Maintenance
Page
4
Rev. 10/22/08
Q10-IOM-Q
.doc
R
ECEIVING
The shipment should be thoroughly inspected as
soon as it is received. The signed bill of lading is
acknowledgement by the carrier of receipt in
good condition of shipment covered by our
invoice.
If any of the goods called for on this bill of lading
are shorted or damaged, do not accept them until
the carrier makes a notation on the freight bill of
the shorted or damaged goods. Do this for your
own protection.
NOTIFY
Quality Lifts
AT ONCE if any hidden
loss or damage is discovered after receipt.
IT IS DIFFICULT TO COLLECT FOR LOSS OR
DAMAGE AFTER YOU HAVE GIVEN THE
CARRIER A CLEAR RECEIPT.
File your claim with
Quality Lifts
promptly.
Support your claim with copies of the bill of
lading, freight bill, and photographs, if available.
Component Packing List
QTY/ LIFT
DESCRIPTION
1
Power Column Assembly
1 Idler
Column
Assembly
1 Overhead
Assembly
1 Hardware
Box
1
Power Column Extension
1 Idler
Column
Extension
2
Rear Arm Assembly
2
Front Arm Assembly
2
Synchronizer Cable
Assembly
1 Hydraulic
Hose
Pack
1 Power
Lock
Cover
1 Idler
Lock
Cover
I
NSTALLATION
I
MPORTANT
:
Always wear safety glasses while installing lift.
T
OOLS
(
MINIMUM REQUIRED
)
a. Tape measure, 16ft
b. Chalk
line
c. 4ft
level
d. 10” adjustable wrench
e. Metric open end wrenches 10mm, 13mm,
14mm, 15mm, 17mm, 18mm, 19mm and
24mm
f. Metric Allen Wrenches 4mm, 5mm, 6mm,
and 8mm.
g. Needle
Nose
pliers
h. Snap Ring pliers
i. Hammer drill with 3/4” diameter carbide
tipped bits
j. 2lb
hammer
k. Torque wrench: 150 foot pounds minimum
with 1 1/8” socket
l.
12 ft. Step ladder
m. Anti-Seize lubricant (for arm pins and foot
pad screw threads and stop rings)
L
AYOUT
1) Layout the service bay according to the
architect’s plans or owners instructions
(see
Fig 1b
).
Failure to install in this
orientation can result in personal and
property damage.
Be certain that the
proper conditions exist, see page 3.
2) Assemble column extension to column using
M12 x 30 Hex bolts. Repeat for opposite
column and extension. Install power column
extension on power column, see
Fig 6.
3) Using the Overall Width (C) Dimension from
Fig 1b
, chalk two parallel lines on the floor
within 1/8” tolerance. Erect both column
assemblies. Align the base plate edges to the
chalk lines.