background image

Model Q10 

Installation, Operation and Maintenance 

 Page 

 

Rev. 10/22/08

 

 

 

Q10-IOM-Q

.doc 

R

ECEIVING

 

The shipment should be thoroughly inspected as 
soon as it is received. The signed bill of lading is 
acknowledgement by the carrier of receipt in 
good condition of shipment covered by our 
invoice. 

If any of the goods called for on this bill of lading 
are shorted or damaged, do not accept them until 
the carrier makes a notation on the freight bill of 
the shorted or damaged goods. Do this for your 
own protection. 

NOTIFY 

Quality Lifts

 AT ONCE if any hidden 

loss or damage is discovered after receipt. 

IT IS DIFFICULT TO COLLECT FOR LOSS OR 
DAMAGE AFTER YOU HAVE GIVEN THE 
CARRIER A CLEAR RECEIPT. 

File your claim with 

Quality Lifts

 

promptly. 

Support your claim with copies of the bill of 
lading, freight bill, and photographs, if available. 

 

Component Packing List 

 

QTY/ LIFT 

DESCRIPTION 

Power Column Assembly 

1 Idler 

Column 

Assembly 

1 Overhead 

Assembly 

1 Hardware 

Box 

Power Column Extension 

1 Idler 

Column 

Extension 

Rear Arm Assembly 

Front Arm Assembly 

Synchronizer Cable 
Assembly 

1 Hydraulic 

Hose 

Pack 

1 Power 

Lock 

Cover 

1 Idler 

Lock 

Cover 

 

 

I

NSTALLATION

 

I

MPORTANT

:

 

Always wear safety glasses while installing lift. 

T

OOLS 

(

MINIMUM REQUIRED

a.  Tape measure, 16ft 
b. Chalk 

line 

c. 4ft 

level 

d.  10” adjustable wrench 
e.  Metric open end wrenches 10mm, 13mm, 

14mm, 15mm, 17mm, 18mm, 19mm and 
24mm 

f.  Metric Allen Wrenches 4mm, 5mm, 6mm, 

and 8mm.  

g. Needle 

Nose 

pliers 

h.  Snap Ring pliers 
i.  Hammer drill with 3/4” diameter carbide 

tipped bits 

j. 2lb 

hammer 

k.  Torque wrench: 150 foot pounds minimum 

with 1 1/8” socket 

l. 

12 ft. Step ladder 

m.  Anti-Seize lubricant (for arm pins and foot 

pad screw threads and stop rings) 

L

AYOUT

 

1)  Layout the service bay according to the 

architect’s plans or owners instructions 

(see 

Fig 1b

). 

Failure to install in this 

orientation can result in personal and 
property damage.  

Be certain that the 

proper conditions exist, see page 3. 

2)  Assemble column extension to column using 

M12 x 30 Hex bolts. Repeat for opposite 
column and extension.  Install power column 
extension on power column, see 

Fig 6.

 

3)  Using the Overall Width (C) Dimension from 

Fig 1b

, chalk two parallel lines on the floor 

within 1/8” tolerance. Erect both column 
assemblies. Align the base plate edges to the 
chalk lines. 

 

Summary of Contents for Q10

Page 1: ...Lift MODEL Q10 10 000 LBS CAPACITY 2500 LBS PER ARM QUALITY LIFTS LLC 200 Cabel St P O Box 3972 Louisville KY 40206 FAX 502 583 5488 TOLL FREE 877 771 5438 E mail sales qualitylifts com www qualitylif...

Page 2: ...3314mm F Short Arm Reach 21 3 4 39 1 4 553mm 998mm G Long Arm Reach 38 1 4 55 3 8 971mm 1407mm H Screw Pad Height 4 1 4 7 3 4 109mm 199mm K Inside of Columns 110 1 4 2800mm Lifting Capacity 10 000 lbs...

Page 3: ...installation Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has been evaluated f...

Page 4: ...Arm Assembly 2 Synchronizer Cable Assembly 1 Hydraulic Hose Pack 1 Power Lock Cover 1 Idler Lock Cover INSTALLATION IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a...

Page 5: ...echeck column for plumb Re shim if necessary Torque to 150 foot pounds to set anchors OVERHEAD 11 Raise and install Overhead Assembly using M12 x 30 Hex Bolts 12 Install Overhead Limit Switch under th...

Page 6: ...Cord Lock Release Cable Hydraulic Hose Synchronizing Cables Fig 6 Hose Routing Power Side 23 Route the remaining Power column hose beginning at the elbow fitting at the base up the backside of the col...

Page 7: ...pressure relief will make a high pitch squeal sound for these 10 seconds Check hydraulic system for leaks 40 Energize power unit again for 10 seconds With a clean rag wipe down both cylinder rods The...

Page 8: ...1 5 4 6 Normally Open M Wiring Diagram A2 A1 T9 T5 T4 T6 M T8 T3 T7 T2 T1 1 2 3 4 5 6 L3 L2 L1 T3 T2 T1 FOR SINGLE PHASE FACTORY WIRED FOR 208 240V 6 4 2 5 3 1 RECONNECTIONS FOR 440 480V T3 T2 T1 T9...

Page 9: ...the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance with...

Page 10: ...he lock release lever 4 Lower the vehicle by depressing the lowering valve handle 5 Continue to lower the vehicle until the carriages stop against the base plate Retract the extension arms and park th...

Page 11: ...Model Q10 Installation Operation and Maintenance Page 11 Rev 10 22 08 Q10 IOM Q doc Parts Breakdown...

Page 12: ...Model Q10 Installation Operation and Maintenance Page 12 Rev 10 22 08 Q10 IOM Q doc...

Page 13: ...wl 61 JSJ5B 09 02 00CH 2 Rear Male Arm 17 X10 029 2 Washer 62 JSJ5B 09 01 00B 2 Rear Female Arm 18 X10 030 4 Pulley Axle 63 X10 073 6 Washer 10mm 19 X10 031 4 Pulley 64 X10 074 18 Spring Washer 10mm 2...

Reviews: