Page 29
Quadra-Fire • Hudson Bay • 7003-121_R20 • 11/14
D. Grille Installation
Figure 8.5 -
Following instructions stated above, remove the
door of appliance.
Remove the four screws (two at each end) holding the grille
in place. Lift up to remove.
Install the new grille by reversing the removal instructions.
NOTE:
Clean glass and gold or nickel plating with glass
cleaner and a soft cloth, wiping off all fingerprints prior to
first fire to prevent permanent staining.
E. Brick Set Installation
Figure 8.6 -
The pilot shield has to be removed to install or
remove the brick refractory. Removal of the bracket requires
removing two screws.
Pilot Bracket
Pilot
Shield
Figure 8.7 -
To install the baffle, slide it in at an angle and
rotate upward parallel with the firebox. Place baffle up
against the heat exchangers in top of the firebox. Hold
against heat exchangers, slide baffle towards front of
appliance.
Figure 8.8 -
Keeping the baffle elevated with your hand, put
the right side brick into position. Rest the baffle on the rights
side brick.
Figure 8.9 -
Still holding the baffle in place, install the left
brick into position.