29
6. Connect Cables.
Plug the cables into corresponding
sockets on circuit board. When finished,
tighten the circuit board back
and turn on the power. The red LED will
light. Turn off the power after checking.
NOTE:
Please make sure the power is
off before doing connections.
7. Set Dome ID, Baud Rate and
Protocol.
Set the Dome ID, Baud Rate and Protocol
via DIP switches (Refer to APPENDIX I).
Take the two sponges off.
8. Down Cover Preliminary
Installation.
Attach the safety chain with an M3 nut as
shown in the picture.
The safety chain prevents the down cover
from dropping down.
NOTE
: Connect the heater plug into the
socket in the case of outdoor dome.
Summary of Contents for QT-220EX
Page 1: ...1 QT 220EX 26X Day Night PTZ Dome USER S MANUAL Document Version 1 1 October 06 2005...
Page 9: ...9 Surface Mount Bracket Mount 1 Wall Mount 2 Corner Mount 3 Pole Mount 4 Pendant Mount...
Page 34: ...34 3 2 MENU TREE...
Page 58: ...58...
Page 59: ...59...
Page 67: ...67...