XCubeFAS 2026
Hardware Manual
Quick Maintenance
© 2021 QSAN Technology, Inc. All rights reserved.
www.qsan.com
Official
Document
51
1.
Use one hand to hold one end of the power supply unit (the side with release tab and
handle) and the other hand hold the bottom of the power supply unit; then align the PSU
with the empty PSU slot.
2.
Push the PSU all the way into the empty slot until you hear the “click” sound from the
release tab.
Confirm the PSU Installation
If the PSU is successfully installed, the status LED will show solid
green
color (if no other
malfunction is encountered), then the Power Supply displays
green
box in the XEVO UI
System
-
>
Arrays
.
Figure 4-11 PSU Installed Successfully
4.4.
Removing / Installing Fan Module
The standard system comes with two redundant fan modules that allow you to hot swap it
when one of the fan modules encounters an issue. For more information about the location of
fan module, please refer to the chapter 2.4,
CAUTION
The fan module is heavy; please use both hands while removing, holding, or
carrying the fan module. The fan module is hot swappable, but power off
the system to do the fan module installing or removing is highly
recommended. Recommended place for installing / removing a fan module:
the system is on the well secured rack or onto stable surface.