QSA Global, Inc.
40 North Avenue Burlington, MA 01803
888.272.2242
781.272.2000
qsa-global.com
Operations Manual
MAN-038 March 2019
Page 43 of 100
Calibrated torque wrench (foot/lbs) for ½-13 X 1½ inch hex head bolts (BLT015).
Tamperproof tool bit for security screw.
Small slot screwdriver for source identification tag 6-32 screws.
U-tool (part # SK1761) for functional checks of lock mechanism.
Model A424-13XL (for the SENTRY 330) or Model A424-14XL (for the SENTINEL SENTRY
110) mock source assembly and short length control cable for lock mechanism operational
tests after servicing.
4.3.2 Maintenance
Materials
Mil-spec grease MIL-G-23827B (or C), MIL-PRF-23827C, (or equivalent radiation resistant
grease authorized by QSA Global, Inc.).
Loctite™ 222 low strength threadlocker (GLU018).
Temporary Loctite™ 242 or Vibratite™ thread sealant.
Recommended solvents for cleaning and degreasing operations: clean mineral spirits (Follow
the manufacturer’s safety precautions for use, handling, storage and disposal).
Clean lint-free rags.
12-gauge gun patches or any lint-free cloth for cleaning the ‘S’ tube.
Large pan for use in cleaning and degreasing the remote control drive cable and mechanical
parts.
Stainless steel, brass or synthetic bristle brush to be used during degreasing and cleaning of
parts.
Light viscosity oil, such as 3-in-1™ oil to lubricate plunger lock.
Permatex
TM
anti-seize thread lubricant.
Replacement springs for the locking mechanism –
1 x compression spring part number SPR006
1 x compression spring part number SPR005
2 x compression spring part number SPR004
Replacement springs for the outlet port – 2 x compression spring part number SPR033.
1 x set-screw, half dog point, 6-32 X 7/16, SS, part number SCR251
1 x spring roll-pin, PIN058 (if needed)
1 x plastic tube seal, part number 86084-110 or 88084-330
Bayonet-type source guide tube for operational tests of the outlet port.
When ordering spare parts, quote the model and serial number of the gamma-ray source
projector as well as the part number to ensure correct replacement.
4.3.3 SENTINEL SENTRY 110 & SENTINEL SENTRY 330 Annual Maintenance
Requirements
These gamma-ray source projectors must receive inspection and maintenance at least once a year.
The locking mechanism and outlet port mechanism must be removed from the gamma-ray source
projector and disassembled for proper cleaning, inspection and lubrication of components that are critical
to safety.
These procedures can only be performed on an empty gamma-ray source projector, which
requires transfer of the radioactive source assembly into an approved storage container.
The inspection and maintenance procedures must be performed by personnel specifically trained and
qualified for this work. QSA Global, Inc. service engineers will service these systems at one of their
service centers or in the field upon request.