
- 48 -
3 Startup system
Preparation data --------------------------3.1
Fault diagnosis ---------------------------3.2
Start
electrical machinery ---------------3.3
Start relay ---------------------------------3.4
3.1 Preparation data
Matters needing attention in operation
Disassembly of the start electrical machinery may be conducted on the engine.
Please refer to disassembly operation in disassembly.
Preparation reference
Item Standard
value
Allowable
limit
Brush length of startup motor
12.5mm
8.5mm
Liner of startup idler shaft
8.3mm
Outer diameter of startup idler
shaft
7.94mm
Torque value
Bolt in the clutch cover of the startup electrical machinery 12 N·m
Fixing nut in the clutch of the startup electrical machinery 95 N·m
Tools
Fixing nut spanner
Multiple-use fixing spanner
Summary of Contents for QJ150T-10
Page 15: ... 14 QJ150 10 ...
Page 73: ... 72 Rear wheel rear suspension ...
Page 78: ... 77 Lubrication system figure engine oil strainer oil pump bent axle camshaft piston ...
Page 87: ... 86 ...
Page 97: ... 96 ...
Page 104: ... 103 ...
Page 113: ... 112 Output axle Middle axle Input axle ...
Page 116: ... 115 The assembly of bearings and oil seal should use special tools to prevent damage ...
Page 125: ... 124 Muffler ...
Page 131: ... 130 ...