background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

16

17

0.39 in (10 mm)

0.2 

in 

(5 

mm)

  Maintain an interval of at least 0.39 in (10 mm) 

between two modules along the short side and 
0.20 in (5 mm) along the long side.

3 Installation

3.3 Module installation

Option 1:

  Fasten the module with 4 clamps in the specified 

clamping range, see Fig 2, p. 8.

  Tighten clamps according to manufacturer’s 

instructions.

Note! Module damage may occur!

  Do not subject modules to mechanical tension. Max. 

torsion 0.12 in / ft (10 mm / m).

Option 2:

  Install the module at the 4 mounting points,  

see Fig. 2, p. 8.

  Tighten screws according to manufacturer’s 

instructions.

4 Electrical Connection

4.1 Safety

Danger! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 
electric arcs can occur that may result in life-threatening injuries.

  Do NOT unplug the cable when under load.
  Do NOT connect any exposed cable ends.
  Electrical work may only be performed by qualified and skilled 

personnel (see page 3).

A solar module generates electrical current and voltage even 
at a low intensity of illumination. Sparks and electric arcs may 
result from the separation of a closed circuit. These can result 
in life-threatening injuries. The danger increases when several 
modules are connected in series.

  Please be aware of that the entire open circuit voltage is active 

even at low levels of solar irradiation.

  Please follow the valid national regulations and safety 

guidelines for the installation of electrical devices and systems.

  Please make sure to take all necessary safety precautions. With 

module or phase voltages of more than 120 V, the safety extra-
low voltage range is exceeded.

  Carry out work on the inverter and the wiring with extreme 

caution.

  Ensure that the modules are disconnected at the inverter prior 

to separation.

  Be sure to observe the time intervals specified by the inverter 

manufacturer after switching off the inverter.

  Make sure that the plugs can not be connected unintentionally.
  Before working on the contacts, check them for safety extra-

low voltage.

Danger! Risk of fatal injury due to electric shock!

  Only use dry, insulated tools for electrical work.

Danger! Risk of fatal injury due to electric shock!

  Never open the junction box.
  Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric shock!

  Never touch live contacts with bare hands.
  Cover connectors by suitable protective caps until 

installation.

Danger! Risk of fatal injury due to electric shock!

  Insulate any exposed cable ends.
  Only connect cables with plugs.

Summary of Contents for Q.PEAK DUO XL-G11.X / BFG Series

Page 1: ...Installation and operation manual Q PEAK DUO XL G11 X BFG solar module series...

Page 2: ...d solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the install...

Page 3: ...ALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of with other household waste with...

Page 4: ...the following applications Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accordance with U...

Page 5: ...s FB1 4 mounting slots 20 508 FB2 4 mounting slots 20 508 mFB2 20 508 Tracker installation on mounting points TB1a 39 7 1008 TB1b 32 813 39 7 1008 TB2a 20 or 32 or 39 7 508 or 813 or 1008 TB2b 32 813...

Page 6: ...acer allowed between the module and substructure CL1a FB1 These mounting options are not recommended as mounting rails will cast shade on the module rear side FB1 FB2 TB1a TB1b TB2a TB2b mFB2 Use M8 c...

Page 7: ...erter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks o...

Page 8: ...upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 Installation 3 2 Pr...

Page 9: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire op...

Page 10: ...of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity 4 Electrical Connection 4 3 Connection of modules Use...

Page 11: ...0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are marked with a ground sy...

Page 12: ...Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occ...

Page 13: ...nstallation manual solar modules Q PEAK_DUO_XL G11 X BFG_modules_series_2022 07_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry q...

Reviews: