INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

18

19

click

4 Electrical Connection

4.2 Electrical installation safety

Danger! Risk of fatal injury due to electric shock!

  Be sure to maintain the time intervals as specified by 

the inverter manufacturer between switching off the 
inverter and beginning any further work.

Danger! Risk of fatal injury due to electric shock!

  Never plug or unplug the cable when under load. 

Modules must not carry any current.

1. Switch off the inverter.

OFF

2. Switch off the DC circuit breaker.

3.  Measure shutdown in DC String. 

(no DC current flow).

4.  Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.  When connecting the modules proceed in reverse 

order.

Danger! Risk of fatal injury due to electric shock!

  Electrical work may only be performed by qualified 

and skilled personnel (see page 3).

  Ensure correct polarity.

4 Electrical Connection

4.3 Connection of modules

  Use solar cables for the connection at the junction 

box outlet.

  Only interconnect connectors of the same type and 

manufacturer.

  Use minimum No. 12 AWG copper wires insulated for 

a minimum of 90 °C for field connections.

Note! Module damage may occur!

  Ensure that the cabling is not under mechanical stress 

(Comply with bending radius of ≥ 2.36 in (60 mm)).

  Ensure that the cables do not run between module 

and mounting rail or structure (danger of pinch).

  Position the wiring on the solar modules that 

additional shading is avoided.

  Ensure for a tight connection between the plugs. 

Plugs click together audibly.

Danger! Risk of fatal injury due to electric shock!

  Ensure that all electrical components are in a proper, 

dry, and safe condition.

  Do not connect modules with different orientations or 

angles of inclination in the same string.

SOLAR

Summary of Contents for Q.PEAK DUO XL-G11.X / BFG Series

Page 1: ...Installation and operation manual Q PEAK DUO XL G11 X BFG solar module series...

Page 2: ...d solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the install...

Page 3: ...ALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of with other household waste with...

Page 4: ...the following applications Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accordance with U...

Page 5: ...s FB1 4 mounting slots 20 508 FB2 4 mounting slots 20 508 mFB2 20 508 Tracker installation on mounting points TB1a 39 7 1008 TB1b 32 813 39 7 1008 TB2a 20 or 32 or 39 7 508 or 813 or 1008 TB2b 32 813...

Page 6: ...acer allowed between the module and substructure CL1a FB1 These mounting options are not recommended as mounting rails will cast shade on the module rear side FB1 FB2 TB1a TB1b TB2a TB2b mFB2 Use M8 c...

Page 7: ...erter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks o...

Page 8: ...upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 Installation 3 2 Pr...

Page 9: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire op...

Page 10: ...of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity 4 Electrical Connection 4 3 Connection of modules Use...

Page 11: ...0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are marked with a ground sy...

Page 12: ...Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occ...

Page 13: ...nstallation manual solar modules Q PEAK_DUO_XL G11 X BFG_modules_series_2022 07_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry q...

Reviews: