background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G11.X / BFG

14

15

3 Installation

3.1 Safety and Transport

Note! Module damage may occur!

  Do not stack modules.

Note! Module damage may occur!

  Do not install modules near flammable gas / vapors.
  Do not install modules in close proximity to air 

conditioning systems.

Note! Module damage may occur!

  Do not drop modules.

Note! Module damage may occur!

  Only make modifications to the module which have 

been confirmed in writing by Qcells.

confirmation

letter

Note! Module damage may occur!

  Never lift or move the module with the connection 

cables or junction box.

  Carry modules upright and horizontally as shown.

Note! Module damage may occur!

  Never step on modules.
  Do not subject modules to any mechanical stress.
  Do not allow any objects to fall onto modules

3 Installation

3.2 Preparation of installation

Danger! Risk of fatal injury due to electric shock!

  Block off the installation zone.
  Keep children and unauthorized individuals away 

from the solar power system.

Danger! Risk of fatal injury due to electric shock!

  Ensure that modules and tools are not subject to 

moisture or rain at any time during installation.

Warning! Risk of injury due to falling modules!

  Secure modules during installation.
  Do not install modules in windy or wet weather. 

Danger! Risk of fatal injury due to electric shock!

  Only use dry, insulated tools.

  Do not carry out the installation alone.

 

Only install undamaged modules and components.

  Do not modify the module 

(e.g. do not drill any additional holes).

Summary of Contents for Q.PEAK DUO XL-G11.X / BFG Series

Page 1: ...Installation and operation manual Q PEAK DUO XL G11 X BFG solar module series...

Page 2: ...d solar module operator are responsible for compliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the install...

Page 3: ...ALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of with other household waste with...

Page 4: ...the following applications Operating temperatures from 40 F to 185 F Pull loads and push loads according to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accordance with U...

Page 5: ...s FB1 4 mounting slots 20 508 FB2 4 mounting slots 20 508 mFB2 20 508 Tracker installation on mounting points TB1a 39 7 1008 TB1b 32 813 39 7 1008 TB2a 20 or 32 or 39 7 508 or 813 or 1008 TB2b 32 813...

Page 6: ...acer allowed between the module and substructure CL1a FB1 These mounting options are not recommended as mounting rails will cast shade on the module rear side FB1 FB2 TB1a TB1b TB2a TB2b mFB2 Use M8 c...

Page 7: ...erter into account when determining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks o...

Page 8: ...upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 Installation 3 2 Pr...

Page 9: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire op...

Page 10: ...of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity 4 Electrical Connection 4 3 Connection of modules Use...

Page 11: ...0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are marked with a ground sy...

Page 12: ...Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialist NOTE Module surface damage may occ...

Page 13: ...nstallation manual solar modules Q PEAK_DUO_XL G11 X BFG_modules_series_2022 07_Rev01_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry q...

Reviews: