
_____________________________________________________________________________________________
Q3
ENERGIE
Installation and operating instructions Q
X
³ series
45/109
Version 1.0, Stand 27.04.2015
Installation and operating instructions
Q
X
³ series
DC connection (PV generator):
No.
Action
1
Check PV strings for earth connection.
2
Prepare and assemble the DC plug-in connector (SUNCLIX) as described above.
3
Move the DC switch to the position “Off”.
4
Carry out measurements to verify that both strings on an input each have the same
electrical data (e.g. open circuit voltage).
5
Connect the PV strings to the selected female connectors of the device, observe
polarity and lock the plug-in connector.
It is imperative that strings with different configurations are connected to separate
inputs.
6
Seal off unused connections with the dummy plugs provided.
Input voltage characteristic