
_____________________________________________________________________________________________
Q3
ENERGIE
Installation and operating instructions Q
X
³ series
39/109
Version 1.0, Stand 27.04.2015
Installation and operating instructions
Q
X
³ series
Tools needed:
Slotted-head screwdriver with 3 mm-wide blade
Materials needed:
+ PV plug-in connector
- PV plug-in connector
PV1-F solar cable
Design of DC plug-in connector +
Pos
DESCRIPTION
1
Sleeve
2
Contact and clamping spring
3
Contact insert
4
Rubber seal
5
Cable gland
Preparing the PV cable:
No.
Action
1
Strip the cable back 15 mm. Take care while doing this not to cut off any single wires.