
_____________________________________________________________________________________________
Q3
ENERGIE
Installation and operating instructions Q
X
³ series
23/109
Version 1.0, Stand 27.04.2015
Installation and operating instructions
Q
X
³ series
4.2 Unpacking the inverter
Place the inverter carton with the underside downwards.
Unpacking
No.
Action
1
Open the box with a suitable tool
2
Remove the accompanying documentation and the mounting parts
3
At least two persons should now remove the inverter from the carton. To do this take hold of
the long side of the inverter with two hands and lift the upright inverter up and out of the
carton.
4.3 Installing the inverter
Approved alignment of inverter:
Minimum clearance of individual inverters: