INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G6+ / AC – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK-G6+ / AC – Q CELLS

 

 

Installation and Operation Manual 

 

 2020 Enphase Energy Inc. All rights reserved. 

 

 

15 

Step 3: Terminate the Unused End of the Cable 

Place sealing caps on unused connectors and terminate the unused end of the Enphase Q Cable.  

A.  Cover any unused connectors with Enphase Sealing Caps. Listen for a click as the connectors 

engage.  

 

WARNING

: Risk of electric shock. Risk of fire. Install sealing caps on all unused AC 

connectors as these connectors become live when the system is energized. Sealing caps 

are required for protection against moisture ingress. 

 

NOTE

: If you need to remove a sealing cap, you must use the Enphase Disconnect Tool.  

See “Remove and Replace a Microinverter” on page 43. 

 

B.  Remove 13 mm (½ inch) of the cable sheath from the conductors. Use the terminator loop to 

measure 13 mm.  

 

C.  Slide the hex nut onto the cable. The grommet inside of the hex nut should remain in place.  

D.  Insert the cable into the terminator body so that each of the two wires land on opposite sides of 

the internal separator.  

 

E.  Insert a screwdriver into the slot on the top of the terminator to hold it in place and torque the nut 

to 7 Nm. 

F.  Hold the terminator body stationary with the screwdriver and 

turn only the hex nut to prevent conductors from twisting out 

of the separator. 

 

NOTE:

 Turn only the hex nut to prevent conductors 

from twisting out of the separator.  

 

G.  Attach the terminated cable end to the PV racking with a 

cable clip or tie wrap so that the cable and terminator do not 

touch the roof.   

WARNING

: The terminator cannot be re-used. If 

you unscrew the nut, you must discard the 

terminator. 

 

 

13mm 

Terminator 

Body 

Internal view 

 

 

Installation and Operation Manual 

 

 2020 Enphase Energy Inc. All rights reserved. 

 

 

16 

Step 4: Prepare the AC Modules

 

A.  Before installing the AC module, the microinverters must be lifted from the shipping position. On 

the ground, turn the AC Module so that the microinverter faces you. Using both hands, lift the 

microinverter up. You will hear four clicks as the microinverter locks into the installation position. 

Ensure the four latches are locked, and the microinverter is not tilted.  

 

 

 

 

 

 

 

 

 

NOTE

: If you need to move the module, you can return the microinverter to the shipping position using 

the Enphase Disconnect Tool. Use the tool to depress the four locking mechanisms on each corner of the 

microinverter to return it to the shipping position. 

 

B.  Installer has to scan the microinverter Serial Number using the 

Enphase Installer Toolkit mobile app. 

C.  Position the AC Modules as planned on the rail.  

The Microinverter is in the shipping position. 

The Microinverter is lifted and ready for installation. 

Make sure the microinverter is not tilted. 

Use this end of the disconnect tool  

to depress the locking mechanisms. 

Summary of Contents for Q.PEAK DUO BLK-G6+/AC

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO BLK G6 AC Solar Module Series ...

Page 2: ... The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such as country specific regu lations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Applicable country spe...

Page 3: ...tallation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATIONORCONFIGURATION IM PROPERMAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION DON...

Page 4: ... if required by the utility 2 PLANNING 2 1 TECHNICAL SPECIFICATIONS Topic Unit Min Typical Max MISCELLANEOUS PARAMETERS Maximum Microinverters per 20 amp Branch Circuit 240 VAC single phase 208 VAC single phase A 13 11 CEC Weighted Efficiency 240 VAC single phase 208 VAC single phase 97 0 96 5 Static MPPT Efficiency weighted ref EN 50530 99 0 Total Harmonic Distortion 5 Ambient Temperature Range C...

Page 5: ...ensuring that maximum power available from each PV module is exported to the utility grid regardless of the performance of the other PV modules in the array While an individual PV module in the array may be affected by shading soiling orientation or PV module mismatch each Enphase MicroinverterensurestopperformanceforitsassociatedPVmodule System Monitoring Once you install the Enphase IQ Envoy or ...

Page 6: ...ording to chapter 2 3 Test Load in accordance with IEC 61215 and Design Load 1 5 in accor dance with UL 1703 Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conforms to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting o...

Page 7: ...ductorlengthsintheVoltageRiseTechnicalBriefatenphase com support Refer to this brief for voltage rise values in Enphase Q Cables and on how to calculate voltage rise in other wire sections of the system Standard guidelines for voltage rise on feeder and AC branch circuit conductors might not be sufficient for microinverter AC branch circuits that contain the maximum allowable microinverters This i...

Page 8: ...OSITION OF CLAMPS MM TEST LOAD PUSH PULL PA DESIGN LOAD PUSH PULL PA SAFETY FACTOR IP2 2400 2200 1600 1470 1 5 Distance between outer edge of module and middle of the clamp consider further details below Loads according to IEC 61215 2 2016 and UL 1703 Test procedure according to IEC 61215 2 2016 and UL 1703 Mounting options do not fulfill the requirements of the standards ATTENTION Ä The loads in ...

Page 9: ... percent 80 percent derating which may be applicable Module Connection Detailed information about interconnecting modules are specified in section 9 Appendix on page 28 NOTE When installing different product versions the lowest minimum permitted reverse current load capacity applies 2 PLANNING 2 6 ELECTRICAL LAYOUT 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Ä Leave modules in their original packaging...

Page 10: ...er step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system DANGER Risk of fatal injury due to electric shock Ä Ensure that modules and tools...

Page 11: ... the valid national regulations and safety guidelines for the installation of electrical devices and systems Ä Make sure to take all necessary safety precautions With mod ule or phase voltages of more than 120V the safety extra low voltage range is exceeded Ä Carry out work on the inverter and the wiring with extreme caution Ä Ensure that the modules are disconnected at the inverter prior to separ...

Page 12: ...s a heat sink Under normal operating conditions the temperature could be 20 C above ambient but under extreme conditions the microinverter can reach a temperature of 90 C To reduce risk of burns use caution when working with microin verters 90 C Ä Only use connector and solar cables provided from Enphase Q Cable please see page 8 Ä Only interconnect connectors of the same type and manufacturer Ä U...

Page 13: ...e Q CELLS frames and modules reference should be made to local statutes and regulations for specific requirements on grounding The U S National Electrical Code addresses these issues in Article 250 Proper grounding is achieved by bonding all exposed non current carrying metal equipment to the appropriately sized equipment grounding conductor EGC or racking system that can be used for integrated gr...

Page 14: ...ed by dirt or debris e g plants bird droppings it needs to be cleaned to prevent a loss of performance Maintenance Ä The PV system has to be inspected regularly by certified personnel Ä The time intervals and extent of the inspection can depend on local circumstances e g salt ammonia content in the air high humidity etc The customer operator must inform him herself about time intervals and extend ...

Page 15: ... shock Do not use Enphase equipment in a manner not specified by the manufacturer Doing so may cause death or injury to persons or damage to equipment Be aware that installation of this equipment includes risk of electric shock The DC conductors of this photovoltaic system are ungrounded and may be energized Always de energize the AC branch circuit before servicing Enphase does not recommend disco...

Page 16: ...ially explosive environments Do not allow the terminator to come into contact with open flame Fit the terminator cap using only the prescribed tools and in the prescribed manner Use the terminator to seal the conductor end of the Enphase Q Cable no other method is allowed Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 7 PV Rapid Shutdown Equipment PVRSE This product ...

Page 17: ...voltage at the site is within range Service Type and Voltage L1 L2 240 V Split Phase 211 to 264 VAC 208 V Single Phase 183 to 229 VAC B Install a junction box at a suitable location on the racking C Provide an AC connection from the junction box back to the electricity network using equipment and practices as required by local jurisdictions Step 2 Position and Connect the Enphase Q Cable A Plan ea...

Page 18: ... turn only the hex nut to prevent conductors from twisting out of the separator NOTE Turn only the hex nut to prevent conductors from twisting out of the separator G Attach the terminated cable end to the PV racking with a cable clip or tie wrap so that the cable and terminator do not touch the roof WARNING The terminator cannot be re used If you unscrew the nut you must discard the terminator 13m...

Page 19: ...ips Cable clip B Dress any excess cabling in loops so that it does not contact the roof Do not form loops smaller than 12 cm 4 in diameter Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 18 Step 8 Ground the ACMs Choose to use grounding clamps or module mounting holes to ground the modules Or you can use a reliable third party grounding system All Methods A Ground the...

Page 20: ...er to DC Resistance Low Power Off Condition on page 40 The Microinverter LED Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 20 Step 10 Set Up and Activate Monitoring Refer to the Enphase IQ Envoy Quick Install Guide to install the IQ Envoy and set up system monitoring and grid management functions This guide leads you through the following Connecting the IQ Envoy Det...

Page 21: ...d the microinverter stops power production and raises this condition This may indicate defective module insulation defective wiring or connectors moisture ingress or a similar problem Although the cause may be temporary this microinverter condition persists until the sensor is manually reset An IQ Envoy is required to clear this condition The condition clears on operator command unless its cause i...

Page 22: ...ables from the PV module to measure microinverter current This will be under one amp if AC is disconnected K Verify the PV module DC voltage is within the allowable range shown in Specifications on page 6 of this manual Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 24 L Following the steps in Remove and Replace a Microinverter remove the PV panel from the roof and s...

Page 23: ...y O Ship the old microinverter to Enphase using the supplied return shipping label Microinverter Communications LED Device Scan button Installation and Operation Manual 2020 Enphase Energy Inc All rights reserved 26 Enphase Q Cable Planning and Ordering The Enphase Q Cable is a continuous length of 12 AWG double insulated outdoor rated cable with integrated connectors for microinverters These conn...

Page 24: ...horized installer following the requirements of the local electrical utility is allowed to make Grid Profile adjustments NOTE Grid profile changes are applied only after a microinverter is detected In some regions and in some situations microinverter trip points may be adjusted to account for high grid voltage or for local conditions Grid profile management tasks include Set the grid profile for y...

Page 25: ...pectrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO BLK G6 _AC_2020 07_Rev02_NA ...

Reviews: