background image

2

3

INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

2

3

DOCUMENT REVISION 04

This Manual is valid for Africa, Asia, Europe, Latin America, North America, South America as of July 1

st

 2016 for B.LINE PRO-G4.X,  

B.LINE PRO BFR-G4.X, B.LINE PLUS-G4.X, B.LINE PEAK-G4.X, B.LINE PEAK BLK-G4.X, B.LINE PLUS S-G4.X, B.LINE PEAK S-G4.X solar mod-
ules, and replaces all earlier versions. 

With solar modules from Hanwha Q CELLS (hereafter referred 
to as "Q CELLS") you can directly transform the sun’s limitless 
energy into environmentally-friendly solar electricity.
In order to ensure the maximum performance of your Q CELLS 
solar modules, please read the following instructions care-
fully and observe all guidelines. Non-compliance may result 
in damage and/or physical injury.

This installation and operation manual (hereafter also 
referred to as the “Manual”) provides instructions for 
the safe installation and operation of crystalline solar 
modules.

 

Ä

Please read these instructions carefully before proceeding 
with your installation.

 

Ä

Please retain these instructions for the life of the solar 
modules.

 

Ä

Please ensure that this Manual is available to the operator 
at all times.

 

Ä

This Manual should be given to all subsequent owners 
or users of the solar modules.

 

Ä

All supplements received from the manufacturer should 
be included.

 

Ä

Please observe all other applicable documents.

 

Ä

If your questions are not satisfactorily answered 

 

in the manual, please contact your system supplier. 

Additional information can be found on our website at 
www.q-cells.com. 

Intended Use

This manual is valid for Africa, Asia, Europe, Latin America, 
North America, South America. These instructions 
contain information regarding the safe handling and use 
of quality crystalline solar modules from Q CELLS and 
for their installation, mounting, wiring, maintenance and 
disposal. 

Symbols and Labels

The following symbols and labels are used throughout the 
Manual for ease of use. 

SYMBOL

DESCRIPTION

 

Ä

 

Procedure with one or more steps. 

• 

 

Lists of items.

Ensure that when carrying out a pro-
cedure, you check the results of said 
procedure.
  

Prohibited.
 

Beware of possible danger or damage. 
Categories:

• 

Danger: Risk of fatal injury

• 

Attention: Risk of serious injury 
or damage to property

• 

Note: Risk of damage to product

Safety Regulations

In particular the installer as well as the operator of a 
module is responsible for compliance with all applicable 
statutory requirements and regulations. 

 

Ä

Unless otherwise specified by any laws or regulations, 

the following stipulations must be upheld at all times 
during the installation, operation, and maintenance of 
the solar modules: 

• 

This manual.

• 

Other applicable stipulations (such as country-specific 

regulations for pressure equipment, operational safety, 
hazardous goods, and environmental protection).

• 

Regulations and requirements specific to the system.

• 

Any applicable laws and requirements, in particular 

international,  country  specific,  regional  laws  and 

stipulations governing the planning, installation, and 
operation of solar power systems and work on roofs.

• 

Any valid international, national and regional regulations 
governing work with direct current, especially those 
applicable to the installation of electrical devices and 
systems, and regulations issued by the respective 
energy provider governing the parallel operation of 
solar power systems.

• 

Any  international,  country  specific  and  regional 

accident-prevention regulations.

• 

Other applicable stipulations provided by the relevant 
national institutions regarding safety in the installation 
and operation of electical items. For example, in 
Germany the Bau-Berufsgenossenschaft (German 
institution for statutory accidence insurance and 
prevention in the building trade).

Qualified & Skilled Personnel

Both, the installer and operator are responsible for 
ensuring that installation (including connection to the 
grid), maintenance and dismantling are carried out by 

trained  and  qualified  specialists  with  approved  training 
certificates (issued by a state or federal organization) for 

the respective specialist trade.

Electrical  work  may  only  be  performed  by  an  officially 
certified tradesperson in accordance with the stipulations 

applicable in the relevant country with regard to norm and 
regulations (in Germany e.g. DIN norms, VDE regulations) 
and the stipulations of the local grid operator and/or 
energy provider.  

TABLE OF CONTENTS

1  INTRODUCTION  

3

2 PLANNING  

5

2.1  Technical specifications 

 

5

2.2 Requirements 

 

6

2.3  Mounting options  

7

2.4  Electrical layout  

10

3 INSTALLATION 

 

11

3.1  Safety and transport  

11

3.2  Preparation of installation  

13

3.3  Module installation  

14

4  ELECTRICAL CONNECTION  

15

4.1 Safety 

 

15

4.2  Electrical installation safety  

16

4.3  Connection of modules  

17

4.4  After installation  

18

5 GROUNDING 

 

19

6  FAULTS AND DEFECTS  

19

7 DISPOSAL 

 

19 

8  MAINTENANCE AND CLEANING  

20

1 INTRODUCTION

Summary of Contents for B.LINE G4

Page 1: ...Valid for Africa Asia Europe Latin America North America South America B LINE G4 SOLAR MODULES INSTALLATION AND OPERATION MANUAL...

Page 2: ...tions In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Unless otherwise specified by any laws or...

Page 3: ...ontext of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Please observe the instructions for an...

Page 4: ...es e g caused by vibrations twisting or expansion are generated on the module Ensure that the clamps and the mounting frame are compatible Clamp System Requirements Use customary clamps that satisfy t...

Page 5: ...ection cables of the junction box don t run between laminate and substructure Use M8 corrosion proof screws and washers min diameter 16 mm Specifications MODULE TYPE MOUNTING OPTION CLAMPING AREA1 MM...

Page 6: ...tors Sizing of control systems connected to the outlets of the solar modules Please follow the valid national guidelines for the installation of electrical systems Series Connection Connection of modu...

Page 7: ...the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION NOTE Module damage ma...

Page 8: ...me caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter High voltage components need ti...

Page 9: ...due to electric shock Ensure that all electrical components are in a proper dry and safe condition Standard wiring with a return cable Inverter EN 4 3 Connection of modules 4 ELECTRICAL CONNECTION DA...

Page 10: ...ot attempt to fix any problems yourself e g glass cracks damaged cables Please contact an installer or Q CELLS Technical Customer Service Department 6 FAULTS AND DEFECTS Do not disconnect modules by y...

Page 11: ...alone or without taking adequate security precautions Please commission a trade specialist Clean the modules as follows NOTE Module surface damage may occur Remove snow and ice without force e g with...

Page 12: ...nenallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installatio...

Reviews: