INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

Installation Site

Please note the following guidelines that apply to the 
installation site:

• 

The modules have been tested according to IEC 61215 
for operation in a temperate climate.

• 

Solar modules are not explosion-proof.

 

Ä

Do not operate solar modules near highly flammable gas 

and vapors (e.g. gas tanks, gas stations).

 

Ä

Do not install modules in enclosed space.

 

Ä

Do not install modules in locations where they may be 

submerged in water for lengthy periods (e.g. floodplains).

 

Ä

Do not use modules as a substitute for the normal 

roofing (e.g. modules are not rainproof).

 

Ä

Do not install modules in close proximity to air conditioning 
systems

The solar modules are designed for the following applica-
tions:

• 

Operating temperatures from –40 °C to +85 °C  
(–40 °F to +185 °F). 

• 

Wind loads up to max. 4,000 Pa and snow loads up 
to max. 5,400 Pa (Test-load in accordance with IEC 
61215, see chapter 2.3 mounting options).

• 

Installation using a mounting frame for solar modules.

Prevention of Shadowing Effects

Optimal  solar irradiation leads to maximum energy output:

 

Ä

For this reason, install the modules so that they face 
the sun. 

 

Ä

Avoid shadowing  (due to objects such as buildings, 
chimneys or trees). 

 

Ä

Avoid partial shading (for example through overhead 
lines, dirt, snow).

Mounting Frame Requirements

The Modules shall be installed and operated on mounting 
frames that comply with any applicable laws and stipula-
tions as well as with the following:

• 

Conform to the necessary structural requirements.

• 

Compliant with local snow and wind loads.

• 

Properly fastened to the ground, the roof, or the façade.

• 

Forces acting on the module are relayed to the mounting 
substructure.

• 

Ensures sufficient rear ventilation of the module.

• 

Guarantees long-term stability. 

• 

Avoid the usage of different metals to prevent contact 
corrosions.

• 

Allows for stress-free expansion and contraction due to 

temperature fluctuations.

 

Ä

Ensure that no mechanical stresses (e.g., caused by vibrations, 
twisting, or expansion) are generated on the module. 

 

Ä

Ensure that the clamps and the mounting frame are 
compatible.  

Clamp System Requirements

Use customary clamps that satisfy the following require-
ments:

• 

Clamp width: 

 40  mm.

• 

Clamp height compliant with a 32 mm frame height.

• 

Clamp depth: 7–12 mm.

• 

Clamps are not in contact with the front glass.

• 

Clamps do not deform the frame.

• 

Clamps that satisfy the structural requirements of the 
installation site.

• 

Long-term stable clamps that securely affix the module 

to the mounting frame.

Module Orientation Requirements

• 

Vertical or horizontal installation is permitted.

 

Ä

Ensure that rain and melting snow can run off freely. 
No water accumulation.

 

Ä

Ensure that the drainage holes in the frame are not 
covered. No sealing.

 

Ä

Maintain the permissible angle of 
inclination.

• 

Minimum angle of inclination: 3°

• 

Maximum angle of inclination: 75°

• 

Follow the directions for installation 
angles < 5° (“Grounding”, p. 19)

75°

2.2  Requirements

2 PLANNING

Fig. 3: 

Installation options for crystalline Q CELLS modules. All dimensions are given in mm. Also observe the  

 

 

allowed static loads and clamping range as specified on the following page.

 

 

The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

2.3  Mounting options

2 PLANNING

TYPE OF 
INSTALLATION

MODULE

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH  
CLAMPS

B.LINE PRO-G4.X
B.LINE PRO BFR-G4.X
B.LINE PLUS-G4.X
B.LINE PEAK-G4.X
B.LINE PEAK BLK-G4.X

B.LINE PLUS S-G4.X
B.LINE PEAK S-G4.X

HYBRID CLAMP-
ING

B.LINE PRO-G4.X
B.LINE PRO BFR-G4.X 
B.LINE PLUS-G4.X
B.LINE PEAK-G4.X
B.LINE PEAK BLK-G4.X

INSTALLATION  
ON MOUNTING  
POINTS

B.LINE PRO-G4.X
B.LINE PRO BFR-G4.X 
B.LINE PLUS-G4.X
B.LINE PEAK-G4.X
B.LINE PEAK BLK-G4.X

B.LINE PLUS S-G4.X
B.LINE PEAK S-G4.X

INSTALLATION 
WITH  
INSERTION  
PROFILES

B.LINE PRO-G4.X
B.LINE PRO BFR-G4.X 
B.LINE PLUS-G4.X
B.LINE PEAK-G4.X
B.LINE PEAK BLK-G4.X

NOT PERMITTED

CL3

CL4

250 - 450

150 - 350

0 - 300

0 - 300

CL3

CL4

CL4

0 - 200

CL1

250 - 450

150 - 350

CL1

345

274

FB2

EN

4 × Fastening 
points

4 × Fastening 
points

FB2

EN

345

4 x Fastening 
points

274

4 x Fastening 
points

FB1

FB1

300 - 400

0 - 100

CL5

0 - 100

CL2

0 - 100

CL2

IP1

IP2

IP1

IP2

Summary of Contents for B.LINE G4

Page 1: ...Valid for Africa Asia Europe Latin America North America South America B LINE G4 SOLAR MODULES INSTALLATION AND OPERATION MANUAL...

Page 2: ...tions In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Unless otherwise specified by any laws or...

Page 3: ...ontext of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Please observe the instructions for an...

Page 4: ...es e g caused by vibrations twisting or expansion are generated on the module Ensure that the clamps and the mounting frame are compatible Clamp System Requirements Use customary clamps that satisfy t...

Page 5: ...ection cables of the junction box don t run between laminate and substructure Use M8 corrosion proof screws and washers min diameter 16 mm Specifications MODULE TYPE MOUNTING OPTION CLAMPING AREA1 MM...

Page 6: ...tors Sizing of control systems connected to the outlets of the solar modules Please follow the valid national guidelines for the installation of electrical systems Series Connection Connection of modu...

Page 7: ...the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION NOTE Module damage ma...

Page 8: ...me caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter High voltage components need ti...

Page 9: ...due to electric shock Ensure that all electrical components are in a proper dry and safe condition Standard wiring with a return cable Inverter EN 4 3 Connection of modules 4 ELECTRICAL CONNECTION DA...

Page 10: ...ot attempt to fix any problems yourself e g glass cracks damaged cables Please contact an installer or Q CELLS Technical Customer Service Department 6 FAULTS AND DEFECTS Do not disconnect modules by y...

Page 11: ...alone or without taking adequate security precautions Please commission a trade specialist Clean the modules as follows NOTE Module surface damage may occur Remove snow and ice without force e g with...

Page 12: ...nenallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installatio...