INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

INSTALLATION AND OPERATION MANUAL B.LINE SOLAR MODULES G4 – HANWHA Q CELLS – EN

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

B.LINE

PRO-G4.X 
PRO BFR-G4.X

PLUS-G4.X 

PLUS S-G4.X

PEAK S-G4.X

PEAK-G4.X / 
PEAK BLK-G4.X

Type

Polycrystalline

Q.ANTUM 
Dark

Q.ANTUM 
Dark

Q.ANTUM 
Ultra

Q.ANTUM  
Ultra

Area [m²]

1.67

1.67

1.35

1.35

1.67

Frame height [mm]

32

32

32

32

32

Weight [kg]

18.8

18.8

15

15

18.8

Max. system voltage V

SYS

 [V]

1000

1000

1000

1000

1000

Max. reverse current [A]

20

20

20

20

20

Permissible temperature 

range

–40 °C to +85 °C (–40 °F bis +185 °F)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68

IP68

IP68

IP68

IP68

Fire protection class

C

C

C

C

C

Snow load [Pa]

1

5400

5400

5400

5400

5400

Wind load [Pa]

1

4000

4000

4000

4000

4000

Certificates

VDE Quality Tested; CE-compliant; IEC 61215 (Ed.2) see page 9 et sqq.; IEC 
61730 (Ed.1) Application Class A

1

   Test-load in accordance with IEC 61215

Validity

These instructions are only valid for crystalline solar 
modules from the company Q CELLS. Q CELLS assumes 
no liability for damage resulting from failure to observe 
these instructions. 

 

Ä

Please observe the wiring and dimensioning of the 
system.

 

Ä

The installer of the system is responsible for compliance 
with all necessary safety regulations during set-up and 
installation.

Q CELLS assumes no liability on the basis of these 
instructions. Q CELLS is only liable in the context of 
contractual agreements or in the context of accepted 
guarantees. Q CELLS accepts no other responsibility for 
the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other sys-
tem components that may be part of the complete  
solar power system. It may be necessary to carry out a 
structural analysis for the entire project. 

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar 
power system.

 

Ä

Please contact your system supplier for information 
concerning the formal requirements for solar power 
systems.

 

Ä

Please be sure to contact the relevant local authorities 
and energy providers regarding regulations and permit 
requirements prior to installation of the solar power 

system. Your financial success depends on the fulfillment 

of these requirements. 

Other applicable documents

In addition to this Manual following technical information 
are relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

1 INTRODUCTION

2.1  Technical specifications

2 PLANNING

Fig. 1: 

 External dimensions (in mm) and 

components for B.LINE PRO-G4.X, B.LINE 
PRO BFR-G4.X, B.LINE PLUS-G4.X, B.LINE 
PEAK-G4.X, B.LINE PEAK BLK-G4.X

DETAIL A

16 mm

Junction bo×

Product label

1670 mm

4 × Fastening points (DETAIL A)

Cable with
connectors

Frame

1000 mm

32 mm

8 × Drainage holes

6 × Grounding points ø 4.5 mm

1000 mm

150 mm

8.5 mm

24.5 mm

951 mm

345 mm

980 mm

4 × Fastening points (DETAIL A)

DETAIL A

16 mm

8.5 mm

Junction bo×

Product label

1348 mm

Cable with

connectors

Frame

8 × Drainage holes

6 × Grounding points ø 4.5 mm

32 mm

1000 mm

1000 mm

24.5 mm

100 mm

951 mm

800 mm

Fig. 2: 

 External dimensions (in mm) and components 

for B.LINE PEAK S-G4.X, B.LINE PLUS S-G4.X

Summary of Contents for B.LINE G4

Page 1: ...Valid for Africa Asia Europe Latin America North America South America B LINE G4 SOLAR MODULES INSTALLATION AND OPERATION MANUAL...

Page 2: ...tions In particular the installer as well as the operator of a module is responsible for compliance with all applicable statutory requirements and regulations Unless otherwise specified by any laws or...

Page 3: ...ontext of contractual agreements or in the context of accepted guarantees Q CELLS accepts no other responsibility for the functionality and safety of the modules Please observe the instructions for an...

Page 4: ...es e g caused by vibrations twisting or expansion are generated on the module Ensure that the clamps and the mounting frame are compatible Clamp System Requirements Use customary clamps that satisfy t...

Page 5: ...ection cables of the junction box don t run between laminate and substructure Use M8 corrosion proof screws and washers min diameter 16 mm Specifications MODULE TYPE MOUNTING OPTION CLAMPING AREA1 MM...

Page 6: ...tors Sizing of control systems connected to the outlets of the solar modules Please follow the valid national guidelines for the installation of electrical systems Series Connection Connection of modu...

Page 7: ...the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 2 Preparation of installation 3 INSTALLATION NOTE Module damage ma...

Page 8: ...me caution Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the specified time intervals after switching off the inverter High voltage components need ti...

Page 9: ...due to electric shock Ensure that all electrical components are in a proper dry and safe condition Standard wiring with a return cable Inverter EN 4 3 Connection of modules 4 ELECTRICAL CONNECTION DA...

Page 10: ...ot attempt to fix any problems yourself e g glass cracks damaged cables Please contact an installer or Q CELLS Technical Customer Service Department 6 FAULTS AND DEFECTS Do not disconnect modules by y...

Page 11: ...alone or without taking adequate security precautions Please commission a trade specialist Clean the modules as follows NOTE Module surface damage may occur Remove snow and ice without force e g with...

Page 12: ...nenallee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL service q cells com WEB www q cells com Subject to change without notice Hanwha Q CELLS Installatio...

Reviews: