Pylon Technologies Co., Ltd. Confidential Proprietary
12
Wiring
Ensure the power cord and ground wiring is reasonable. No short circuit,
water and corrosion.
3.2
Equipment Installation
Table 3-2 Installation Steps
Step 1
system
powered down
Step 2
Mechanical
Installation
1. Tab Installation
2. Equipment Installation
Step 3
Electrical
Installation
1. Connecting
Grounding Cable.
2. Electrical Installation
3. Connect the Load
4. Communication
Interface Cascade
5. Communication
Interface Collection
6. Power Supply
3.2.1 Mechanical Installation
Before installation, disconnect the entire device's power directly contact, and
recognizing that the battery is turned off (disconnect the battery power cord and
press the Reset button), to ensure there is no electrification.
1
Tab Installation
There are tabs and mounting accessories equipment box. Before the equipment
fixed, install tabs on both sides of the device, and confirm screws are tightly
connected.
2
Equipment Installation
Extra 2000 products using 19-inch rack-mountable, it can be installed in the
Extra 2000 Lithium Iron Phosphate Battery Backup Manual