11
operating current of the battery-powered load devices must be less than the
maximum discharge current related products in Table 2-7.
Landing Checking
The collocation of landing line in engine room should be furnished ground
radiation or flat, it requiring three separate parts: DC power distribution systems
protection, power system working and lightning protection.
If the area can not provide three kinds of ground because space is limited,
the three kinds can be merging and grounding resistance must be less than 1Ω.
Security Checking
Fire-fighting equipments must be available near the equipments such as powder
fire extinguishers. For more case of requirement, it should be equipped with
automatic fire extinguishing system. No flammable, explosive and other
dangerous items placed next to battery.
3.1.4 Unpacking
When equipments arrive at the installation site, before unpacking, check
whether the box appearance is intact or not, and calculate total number
according to freight highlighted list. Avoiding sunshine and rain, installation
and disassembly must follow regulatory requirements and handling;
To open box slightly to protect the object surface coating;
Reading technical documents and verifying the list firstly before open the
box, to ensure object is complete and intact according to the configuration
tables and packing slips inventory, if the internal packaging is damaged
please scrutinize and record.
3.1.5 Project Coordination
Attention of Previous Work:
Specifications of Power Cord
Power cord should meet the requirements of maximum discharge current of
each product;
Installation Space and Load-bearing
To ensure there is enough space for installation, and sufficient load-bearing
capacity for battery cabinet and brackets.