www.pulsar.pl                                                      POE164864   

                         

GREEN POWER CCTV PoE

 

 

 

3.1. Technical outputs. 

 

The PSU has the following indication outputs: 

 

FPS 

– technical output of the PSU status

:  

-  OC  type  output  indicating  failure  (short-circuit,  overload).  During  normal  operation,  shorted  to  ground 

–  L 

state (0V). In case of power loss, the FPS technical output is switched into hi-Z state (high impedance) at least 
at one of the AUX outputs. 

 

Fig. 6. Electrical diagram of the OC output. 

 
- relay output. In case of failure, relay contacts are switched automatically. 
 

 

Fig. 7. Electrical diagram of the relay output 

 

 

CAUTION!

 The arrangement of contacts at the figure 7 shows a potential-free status of the relay, 

which is equivalent to a state with no v

oltage at any of the AUX1 ÷ AUX16 outputs. 

 

 

 

TAMPER 

– output indicating enclosure opening

:

 - 

volt free contact input indicating the status of the 

power supply doors, PSU closed: contacts closed (NC), PSU open: contacts open (NO).

 

 

4.  Service and operation. 
 

4.1. Overload or short-circuit of the power supply output. 

The  AUX1÷  AUX16  outputs  of  the  PSU  are  protected  against  short-circuit  and  overload  by

 

melting  fuse 

inserts or PTC polymer fuses. If the PTC polymer fuses are used, disconnect the load from the power supply output 
for  approximately  1  minute  to  restore  output  voltage.  (the  time  needed  to  cool  down  the  PTC  fuse).  In  case  of 
melting fuse activation, it should be replaced with a fuse of the same type and of the same rated current. 

 

4.2. Maintenance. 

All  maintenance  procedures  can  be  performed  after  disconnecting  the  power  supply  from  the  power 

network.  The  PSU  does  not  require  any  specific  maintenance;  however,  its  interior  should  be  cleaned  with 
compressed air if used in dusty conditions. In case of fuse replacement, use only compatible replacement parts. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for POE164864

Page 1: ...POE164864 v 1 0 PoE 48V 16x0 4A Switch mode power supply unit for CCTV EN Edition 1 from 01 12 2014 Supersedes the edition GREEN POWER CCTV PoE...

Page 2: ...ation 3 2 Technical outputs 4 Service and operation 4 1 Overload or short circuit of the power supply output 4 2 Maintenance 1 Technical description 1 1 General description The PSU is designed for sup...

Page 3: ...uses in the AUX1 AUX16 F 500mA circuits 4 Jumper to select melting fuse or PTC polymer fuse 5 Green LED L1 L16 voltage indication at the AUX outputs during normal operation these LEDs are on 6 Network...

Page 4: ...www pulsar pl POE164864 GREEN POWER CCTV PoE 4 Fig 2 Components arrangement...

Page 5: ...tion of the power supply output voltage 5 PoE module 6 Plate for mounting the network switch Ethernet switch hub 7 TAMPER microswitch contacts of antisabotage protection NC Tab 2 Components of the PSU...

Page 6: ...wires 35cm Notes The enclosure has a 15mm distance from the mounting surface so the cables can be led PSU cooling fan cooling Safety of use Table 5 Protection class PN EN 60950 1 2007 I first Protect...

Page 7: ...ore installation cut off the voltage in the 230V power supply circuit 2 Mount the PSU in a selected location and lead the connecting cables 3 If required mount the switch network Ethernet Switch Hub o...

Page 8: ...cal indication The PSU has 16 LED lights at the front panel RED LED on DC voltage at the output of the switch mode PSU off no DC voltage at the output of the switch mode PSU RED LED on fuse failure at...

Page 9: ...pening volt free contact input indicating the status of the power supply doors PSU closed contacts closed NC PSU open contacts open NO 4 Service and operation 4 1 Overload or short circuit of the powe...

Page 10: ...here are no technical possibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services are carried out a...

Reviews: