E-mail: [email protected] www.proroute.co.uk
correct voltage polarity. Wrong wiring may damage the router. Pin 1 and Pin 2 are reserved for power,
where Pin 2 is “GND” and PIN 1 is power input “Vin” (DC5~40V).
2.6 Grounding
To ensure a safe, stable, and reliable operation, the H685 router should be grounded
properly. If installed in a cabinet, the cabinet should be properly grounded also.
2.7 Power Supply
There are two options for powering the H685 router:
1) The DC barrel connector into PWR.
2) Via a bare wore-connector into the terminal block.
In most cases, the standard power configuration is 12V/1A, one of these power supplies
with a barrel connector is shipped with the router.
2.8 LED lights and Checking Network Status
LED Light order
Normal system lights on set-up
When the router is first powered on, the following light sequence is a good indication that the
modem is set-up normally. WAN & LAN will come ON briefly then go OFF. The LAN will come
ON and flicker with traffic, the SYS led will come ON for approx. 25 seconds, then will start to
flash and the Wi-Fi LED will come on.
Summary of Contents for H685
Page 32: ...E mail support proroute co uk www proroute co uk...
Page 33: ...E mail support proroute co uk www proroute co uk...
Page 35: ...E mail support proroute co uk www proroute co uk WAN status page...
Page 42: ...E mail support proroute co uk www proroute co uk IPSec Log page...
Page 43: ...E mail support proroute co uk www proroute co uk OpenVPN status page...
Page 58: ...E mail support proroute co uk www proroute co uk...
Page 59: ...E mail support proroute co uk www proroute co uk DIO Default...
Page 60: ...E mail support proroute co uk www proroute co uk...
Page 61: ...E mail support proroute co uk www proroute co uk...
Page 62: ...E mail support proroute co uk www proroute co uk 3 5 7 VPN 3 5 8 1 IPSEC...
Page 72: ...E mail support proroute co uk www proroute co uk 3 5 8 5 GRE tunnel...