![promesstec UREG 200 User Manual Download Page 66](http://html1.mh-extra.com/html/promesstec/ureg-200/ureg-200_user-manual_1616630066.webp)
66
promesstec GmbH
I Niedersachsenstraße 4 I D- 48465 Schüttorf I Tel.:+49 (0)5923/ 90 229 0 I Fax:+49 (0)5923/ 90 229 29
E-Mail: [email protected] I Internet: www.promesstec.com
Keep in mind that after changes in the P-band, the process can take a very long time
to become consistent again, especially with sluggish processes. Manual adjustment
can take from a few minutes to several hours.
In the flowchart, PBu is the
ultimate P-band
, Tu is the
ultimate period
If both values are equal, we speak of the critical-stable state (see picture).
Critical steady state
If the control result after manual adjustment according to the flow chart still does not
provide a satisfactory result, the following rules can be applied:
Setting sequence
Symptom
Solution
1. proportional band (P)
PB1 and/or PB2
Slow response
Reduce PB1 or PB2
High oversteer or
oscillation
Increase from PB1 or
PB2
2. integral time (I)
TI1 and/or TI2
Slow response
Reduce TI1 or TI2
Unstable or oscillating
Increase from TI1 or TI2
3. difference time (D)
TD1 and/or TD2
Slow response or
oscillation
Reduce TD1 or TD2
High oversteer
Increase from TD1 or
TD2