40
conventional procedures shall be used. However, it is important that best practice is followed since
flammability is a consideration. The following procedure shall be adhered to:
•
Remove refrigerant;
•
Purge the circuit with inert gas;
•
Evacuate;
•
Purge again with inert gas;
•
Open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. The system shall be
“
flushed
”
with OFN to render the unit safe. This process may need to be
repeated several times. Compressed air or oxygen shall not be used for this task.
Flushing shall be achieved by breaking the vacuum in the system with OFN and continuing to fill until
the working pressure is achieved, then venting to atmosphere, and finally pulling down to a vacuum.
This process shall be repeated until no refrigerant is within the system. When the final OFN charge is
used, the system shall be vented down to atmospheric pressure to enable work to take place. This
operation is absolutely vital if brazing operations on the pipe-work are to take place.
Ensure that the outlet for the vacuum pump is not close to any ignition sources and there is
ventilation available.
8.Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed.
–
Ensure that contamination of different refrigerants does not occur when using charging equipment.
Hoses or lines shall be as short as possible to minimise the amount of
refrigerant contained in them.
–
Cylinders shall be kept upright.
–
Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
–
Label the system when charging is complete (if not already).
–
Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak tested on
completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to
leaving the site.
9. Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar with the
equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely.
Prior to the task being carried out, an oil and refrigerant sample
shall be taken in case analysis is required prior to re-use of reclaimed refrigerant. It is essential that
electrical power is available before the task is commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure ensure that:
•
Mechanical handling equipment is available, if required, for handling refrigerant
•
cylinders;
•
All personal protective equipment is available and being used correctly;
Summary of Contents for 28964490
Page 1: ...1 Operating instructions Bahag No 28964490 ItemNo JHS A030 09KR2 A W...
Page 24: ...24 PORTABLE AIR CONDITIONER Instruction Manuel...
Page 46: ...46...
Page 47: ...47 I 48 II 51 III 52 IV 55 V 56 VI 58 VII 59 VIII 60 IX 60 X 67 R290 R290...
Page 48: ...48 I 12m2...
Page 49: ...49 50 cm...
Page 50: ...50 8...
Page 51: ...51 35 24 7 35 II LED...
Page 53: ...53 2 3 4 5 6 1 24 7 2 1...
Page 56: ...56 3 2 FULL 3 3 3 4 3 V 1 1 1 1 1 1 2 1 1 2 2 3...
Page 57: ...57 1 2 1 2 45 2 3 1 3 1 50 cm 4 4 5 6 1 2 45...
Page 58: ...58 5 6 280 1500 mm VI 1...
Page 59: ...59 VII EVA EVA EVA 40 104...
Page 60: ...60 VIII 1 2 3 4 5 6 IX 1 1 2 3 4 5 CO2 6...
Page 61: ...61 7 8 9 1...
Page 62: ...62 2 3 4 5 6 LFL 25...
Page 63: ...63 OFN 7 OFN OFN OFN 8 OFN...
Page 64: ...64 9 a b c d e f g h 80 i j k 10 11...
Page 66: ...66 FL 7 35 44 95 17 62 3 ce E2 ce E1...
Page 67: ...67 X...
Page 69: ...69 HORDOZHAT KL MABERENDEZ S Haszn lati utas t s...
Page 91: ...91 P ENOSN KLIMATIZACE U ivatelsk p ru ka...
Page 112: ...112 TRANSPORTABELT KLIMAANL G Brugsvejledning...
Page 133: ...133 PRENOSIVI KLIMA URE AJ Upute za uporabu...
Page 155: ...155 F RANLEG LOFTR STING Lei beiningarhandb k...
Page 176: ...176 DRAAGBARE AIRCONDITIONER Gebruiksaanwijzing...
Page 198: ...198 B RBART KLIMAANLEGG Bruksanvisning...
Page 219: ...219 PRENOSN KLIMATIZA N JEDNOTKA N vod na obsluhu...
Page 240: ...240 Lokal luftkonditionering...
Page 245: ...245 Montering av f nstert tningspl t Avgasr rsmontering...
Page 265: ...265 PRENOSNA KLIMATSKA NAPRAVA Navodila za uporabo...